Method for calculating the settlement of ring pile foundations of tanks
А. И. Полищук, Oleg Shmidt
Abstract
Open-access reader
А. И. Полищук, Oleg Shmidt
Abstract
Open-access reader
Abstract Annotation. A method for calculating the settlement of ring pile foundations of reservoirs on clay soils is considered. The proposed method provides for a separate calculation of the settlement of the central part of the tank (bottom draft) and a reinforced concrete ring pile foundation arranged along its edges (foundation ring settlement). The bottom of the tank is not rigidly connected to the ring foundation. The method of M I Gorbunov-Posadov and others for a flexible round foundation on a linearly deformable base was used. When calculating the settlement of the pile ring, the method of A A Bartolomey was used for strip pile foundations. The work takes into account the assessment of the additional settlement of the bottom and pile ring caused by repeated loading and unloading of the base of the tanks.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Abstract Annotation. A method for calculating the settlement of ring pile foundations of reservoirs on clay soils is considered. The proposed method provides for a separate calculation of the settlement of the central part of the tank (bottom draft) and a reinforced concrete ring pile foundation arranged along its edges (foundation ring settlement). The bottom of the tank is not rigidly connected to the ring foundation. The method of M I Gorbunov-Posadov and others for a flexible round foundation on a linearly deformable base was used. When calculating the settlement of the pile ring, the method of A A Bartolomey was used for strip pile foundations. The work takes into account the assessment of the additional settlement of the bottom and pile ring caused by repeated loading and unloading of the base of the tanks.
Key concepts: Pile, Settlement (finance), Foundation (evidence), Geotechnical engineering, Ring (chemistry), Engineering, Base (topology), Geology