The 3·2 km tunnel under the North Downs in Kent is the longest tunnel on the first section of the £5·2 billion Channel Tunnel Rail Link. It is also has the largest cross-section of any rail tunnel in Europe since no pressure relief shafts were allowed in the environmentally protected area above. This paper reports on how a value engineering process led to a significant change to the tender design, resulting in a 15% saving in cost and programme. Extensive tests of the overlying chalk showed it was stiffer than predicted, thus permitting the use of a thinner unreinforced secondary lining and a flat invert.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The 3·2 km tunnel under the North Downs in Kent is the longest tunnel on the first section of the £5·2 billion Channel Tunnel Rail Link. It is also has the largest cross-section of any rail tunnel in Europe since no pressure relief shafts were allowed in the environmentally protected area above. This paper reports on how a value engineering process led to a significant change to the tender design, resulting in a 15% saving in cost and programme. Extensive tests of the overlying chalk showed it was stiffer than predicted, thus permitting the use of a thinner unreinforced secondary lining and a flat invert.
Key concepts: Channel tunnel, Section (typography), Channel (broadcasting), Railway tunnel, Immersed tube, Geotechnical engineering, Engineering, Geology