Channel Tunnel Rail Link section 1: North Downs tunnel

Paul Watson

Open publisher page 0 citations

Abstract

The 3·2 km tunnel under the North Downs in Kent is the longest tunnel on the first section of the £5·2 billion Channel Tunnel Rail Link. It is also has the largest cross-section of any rail tunnel in Europe since no pressure relief shafts were allowed in the environmentally protected area above. This paper reports on how a value engineering process led to a significant change to the tender design, resulting in a 15% saving in cost and programme. Extensive tests of the overlying chalk showed it was stiffer than predicted, thus permitting the use of a thinner unreinforced secondary lining and a flat invert.

About this research paper

What this paper is about

The 3·2 km tunnel under the North Downs in Kent is the longest tunnel on the first section of the £5·2 billion Channel Tunnel Rail Link. It is also has the largest cross-section of any rail tunnel in Europe since no pressure relief shafts were allowed in the environmentally protected area above. This paper reports on how a value engineering process led to a significant change to the tender design, resulting in a 15% saving in cost and programme. Extensive tests of the overlying chalk showed it was stiffer than predicted, thus permitting the use of a thinner unreinforced secondary lining and a flat invert.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The 3·2 km tunnel under the North Downs in Kent is the longest tunnel on the first section of the £5·2 billion Channel Tunnel Rail Link. It is also has the largest cross-section of any rail tunnel in Europe since no pressure relief shafts were allowed in the environmentally protected area above. This paper reports on how a value engineering process led to a significant change to the tender design, resulting in a 15% saving in cost and programme. Extensive tests of the overlying chalk showed it was stiffer than predicted, thus permitting the use of a thinner unreinforced secondary lining and a flat invert.

Key concepts: Channel tunnel, Section (typography), Channel (broadcasting), Railway tunnel, Immersed tube, Geotechnical engineering, Engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Channel Tunnel Rail Link section 1: North Downs tunnel — Research Paper | ScholarLens