THE NEW CHANNEL TUNNEL SCENARIO. CONSTRUCTION AND OPERATION

Martin Freeman

Open publisher page 0 citations

Abstract

The construction of the single-track rail tunnel would be relatively straightforward using a 4.5 M diameter pilot tunnel to investigate ground conditions. This tunnel, connected at frequent intervals to the main tunnel, would eventually become a service tunnel. Speeds would be limited to 75 mile/h in the tunnel to avoid setting up high temperatures. It is anticipated that 60 trains a day would use the tunnel in convoys of 10 in any one direction before reversing the flow. The tunnel would be closed during six hours of any day for maintenance. The extensive safety arrangements are discussed, particularly those to guard against and deal with a locomotive fire. Driving duties in the tunnel would be shared by BR and SNCF personnel, but because of differences in operating practices the drivers would have to be changed on entering the foreign country. Alternative London terminals are evaluated to give a London-Paris journey time of 4 1/2 hours.

About this research paper

What this paper is about

The construction of the single-track rail tunnel would be relatively straightforward using a 4.5 M diameter pilot tunnel to investigate ground conditions. This tunnel, connected at frequent intervals to the main tunnel, would eventually become a service tunnel. Speeds would be limited to 75 mile/h in the tunnel to avoid setting up high temperatures. It is anticipated that 60 trains a day would use the tunnel in convoys of 10 in any one direction before reversing the flow. The tunnel would be closed during six hours of any day for maintenance. The extensive safety arrangements are discussed, particularly those to guard against and deal with a locomotive fire. Driving duties in the tunnel would be shared by BR and SNCF personnel, but because of differences in operating practices the drivers would have to be changed on entering the foreign country. Alternative London terminals are evaluated to give a London-Paris journey time of 4 1/2 hours.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction of the single-track rail tunnel would be relatively straightforward using a 4.5 M diameter pilot tunnel to investigate ground conditions. This tunnel, connected at frequent intervals to the main tunnel, would eventually become a service tunnel. Speeds would be limited to 75 mile/h in the tunnel to avoid setting up high temperatures. It is anticipated that 60 trains a day would use the tunnel in convoys of 10 in any one direction before reversing the flow. The tunnel would be closed during six hours of any day for maintenance. The extensive safety arrangements are discussed, particularly those to guard against and deal with a locomotive fire. Driving duties in the tunnel would be shared by BR and SNCF personnel, but because of differences in operating practices the drivers would have to be changed on entering the foreign country. Alternative London terminals are evaluated to give a London-Paris journey time of 4 1/2 hours.

Key concepts: Channel tunnel, Train, Railway tunnel, Engineering, Guard (computer science), Full service, Tunnel construction, Mile