AMTRAK-NEC HIGH SPEED RAIL MAINTENANCE FACILITIES

B Flaherty, J Ligammari

Open publisher page 0 citations

Abstract

The article discusses the contract awarded to the Consortium to introduce the country's first high-speed rail service running on the Northeast Corridor. The Consortium members will design and manufacture up to 18 trainsets, with each trainset consisting of two power cars and six coaches, and the supply of 15 high-horsepower electric locomotives to be used in Amtrak's Northeast corridor fleet. Additionally, the contract includes turnkey services for the design and construction of three maintenance facilities to support the rolling stock. The schedule calls for high-speed rail service along the corridor to begin by early 1999.

About this research paper

What this paper is about

The article discusses the contract awarded to the Consortium to introduce the country's first high-speed rail service running on the Northeast Corridor. The Consortium members will design and manufacture up to 18 trainsets, with each trainset consisting of two power cars and six coaches, and the supply of 15 high-horsepower electric locomotives to be used in Amtrak's Northeast corridor fleet. Additionally, the contract includes turnkey services for the design and construction of three maintenance facilities to support the rolling stock. The schedule calls for high-speed rail service along the corridor to begin by early 1999.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The article discusses the contract awarded to the Consortium to introduce the country's first high-speed rail service running on the Northeast Corridor. The Consortium members will design and manufacture up to 18 trainsets, with each trainset consisting of two power cars and six coaches, and the supply of 15 high-horsepower electric locomotives to be used in Amtrak's Northeast corridor fleet. Additionally, the contract includes turnkey services for the design and construction of three maintenance facilities to support the rolling stock. The schedule calls for high-speed rail service along the corridor to begin by early 1999.

Key concepts: Turnkey, Horsepower, Transport engineering, Schedule, Engineering, Service (business), Stock (firearms), Business