2010Mass transitRequires access

Backbone of an Industry

Fred E. Jandt

Open publisher page 0 citations

Abstract

Amtrak president Joe Boardman tells us that America needs a national passenger rail system and that Amtrak is that system. Every part of the United States should be connected by rail regardless of the inevitable problems that come with trying to keep a schedule. The Northeast Corridor with 40 million people living within 40 miles of its tracks has sufficient population density to support high speed rail, but the US may not make the necessary investment. Rail receives disproportionately low federal resources as compared to other modes of transportation. The switch from conventional to high-speed rail is costly due to the need for electrification and to remove all at-grade crossings; only the Northeast Corridor is electrified. A switch to true high-speed rail would require trains skipping stops to create an express service.

About this research paper

What this paper is about

Amtrak president Joe Boardman tells us that America needs a national passenger rail system and that Amtrak is that system. Every part of the United States should be connected by rail regardless of the inevitable problems that come with trying to keep a schedule. The Northeast Corridor with 40 million people living within 40 miles of its tracks has sufficient population density to support high speed rail, but the US may not make the necessary investment. Rail receives disproportionately low federal resources as compared to other modes of transportation. The switch from conventional to high-speed rail is costly due to the need for electrification and to remove all at-grade crossings; only the Northeast Corridor is electrified. A switch to true high-speed rail would require trains skipping stops to create an express service.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Amtrak president Joe Boardman tells us that America needs a national passenger rail system and that Amtrak is that system. Every part of the United States should be connected by rail regardless of the inevitable problems that come with trying to keep a schedule. The Northeast Corridor with 40 million people living within 40 miles of its tracks has sufficient population density to support high speed rail, but the US may not make the necessary investment. Rail receives disproportionately low federal resources as compared to other modes of transportation. The switch from conventional to high-speed rail is costly due to the need for electrification and to remove all at-grade crossings; only the Northeast Corridor is electrified. A switch to true high-speed rail would require trains skipping stops to create an express service.

Key concepts: Train, Electrification, Schedule, Transport engineering, Service (business), Investment (military), Business, Population

Related papers

Back to paper searchBrowse research topicsOriginal source
Backbone of an Industry — Research Paper | ScholarLens