GOOD THINGS FROM A SMALL PACKAGE

Tony Goble, Andrew Kendall

Open publisher page 3 citations

Abstract

This article presents a profile of the Moorcraft Quarry Tunnel in the UK, along with geological graphs, site photos, overhead maps and drilling diagrams. The author notes that the 120 meter tunnel faced significant technical hurdles, such as variable ground, low cover, and highway and gas main crossings. Project statistics, and preplanning are detailed, along with community concerns that limited tunneling options. The use of a TunnelBeamer distometer for reducing safety risks and eliminating the need for lattice girders, and a LaserShell concrete lining, are examined. The article concludes with a discussion of how the construction of a horseshoe shaped pilot tunnel was used to speed project completion.

About this research paper

What this paper is about

This article presents a profile of the Moorcraft Quarry Tunnel in the UK, along with geological graphs, site photos, overhead maps and drilling diagrams. The author notes that the 120 meter tunnel faced significant technical hurdles, such as variable ground, low cover, and highway and gas main crossings. Project statistics, and preplanning are detailed, along with community concerns that limited tunneling options. The use of a TunnelBeamer distometer for reducing safety risks and eliminating the need for lattice girders, and a LaserShell concrete lining, are examined. The article concludes with a discussion of how the construction of a horseshoe shaped pilot tunnel was used to speed project completion.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article presents a profile of the Moorcraft Quarry Tunnel in the UK, along with geological graphs, site photos, overhead maps and drilling diagrams. The author notes that the 120 meter tunnel faced significant technical hurdles, such as variable ground, low cover, and highway and gas main crossings. Project statistics, and preplanning are detailed, along with community concerns that limited tunneling options. The use of a TunnelBeamer distometer for reducing safety risks and eliminating the need for lattice girders, and a LaserShell concrete lining, are examined. The article concludes with a discussion of how the construction of a horseshoe shaped pilot tunnel was used to speed project completion.

Key concepts: Engineering, Civil engineering, Tunnel construction, Transport engineering, Excavation, Construction engineering, Forensic engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
GOOD THINGS FROM A SMALL PACKAGE — Research Paper | ScholarLens