2008Tunnels & tunnellingRequires access

Forging Links in Malmo

P. K. Baillie Reynolds

Open publisher page 0 citations

Abstract

The CityTunnel project in Malmo, Sweden, involved twin fast-track tunnel boring machine (TBM) bores. It also used a cooperative project management system that kept costs down and encouraged innovative solutions. Disciplined risk management was a key aspect, which caused a sharp focus on production. Serious challenges was the concurrent construction of twin running tunnels, with each earth pressure balance machine (EPBM) having to complete two runs that totaled approximately 4.6 km. Excavation, and segment and cross passage tunneling activities are detailed. The article concludes with additional discussion on risk, production, and project management.

About this research paper

What this paper is about

The CityTunnel project in Malmo, Sweden, involved twin fast-track tunnel boring machine (TBM) bores. It also used a cooperative project management system that kept costs down and encouraged innovative solutions. Disciplined risk management was a key aspect, which caused a sharp focus on production. Serious challenges was the concurrent construction of twin running tunnels, with each earth pressure balance machine (EPBM) having to complete two runs that totaled approximately 4.6 km. Excavation, and segment and cross passage tunneling activities are detailed. The article concludes with additional discussion on risk, production, and project management.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The CityTunnel project in Malmo, Sweden, involved twin fast-track tunnel boring machine (TBM) bores. It also used a cooperative project management system that kept costs down and encouraged innovative solutions. Disciplined risk management was a key aspect, which caused a sharp focus on production. Serious challenges was the concurrent construction of twin running tunnels, with each earth pressure balance machine (EPBM) having to complete two runs that totaled approximately 4.6 km. Excavation, and segment and cross passage tunneling activities are detailed. The article concludes with additional discussion on risk, production, and project management.

Key concepts: Engineering, Excavation, Forging, Production (economics), Civil engineering, Project management, Forensic engineering, Construction engineering