Transporting Hong Kong

Ian M. Thoms

Open publisher page 0 citations

Abstract

In response to a mobile, rapidly growing population, Hong Kong’s Kowloon-Canton Railway Corporation is constructing West Rail, a HK$51.7 billion (U.S.$6.7 billion), 30.5 km rail system. West Rail is the largest infrastructure project now being undertaken in Hong Kong. Construction, which began in 1998, includes nine stations, a 32.5 ha depot, and a headquarters building. West Rail is planned to link with existing Hong Kong railway systems—including MTR, East Rail, and an existing light-rail system—to form a more integrated mass transit network. More than 90% of the West Rail line is either on viaduct or in tunnels. The line crosses a 13.4 km main viaduct, which will be the longest in Hong Kong, including six elevated stations. Tunnels account for 14.7 km of the line, and the remaining 2.4 km are at grade. Most of the tunnels will be built using drill-and-blast tunneling methods, but for one 1.8 km tunnel segment an earth-pressure-balanced tunnel-boring machine will be used—the first time a machine of this type has been used in Hong Kong. The overall design includes a number of measures to minimize noise to comply with Hong Kong’s strict noise control ordinance. West Rail is expected to be in operation by 2004.

About this research paper

What this paper is about

In response to a mobile, rapidly growing population, Hong Kong’s Kowloon-Canton Railway Corporation is constructing West Rail, a HK$51.7 billion (U.S.$6.7 billion), 30.5 km rail system. West Rail is the largest infrastructure project now being undertaken in Hong Kong. Construction, which began in 1998, includes nine stations, a 32.5 ha depot, and a headquarters building. West Rail is planned to link with existing Hong Kong railway systems—including MTR, East Rail, and an existing light-rail system—to form a more integrated mass transit network. More than 90% of the West Rail line is either on viaduct or in tunnels. The line crosses a 13.4 km main viaduct, which will be the longest in Hong Kong, including six elevated stations. Tunnels account for 14.7 km of the line, and the remaining 2.4 km are at grade. Most of the tunnels will be built using drill-and-blast tunneling methods, but for one 1.8 km tunnel segment an earth-pressure-balanced tunnel-boring machine will be used—the first time a machine of this type has been used in Hong Kong. The overall design includes a number of measures to minimize noise to comply with Hong Kong’s strict noise control ordinance. West Rail is expected to be in operation by 2004.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In response to a mobile, rapidly growing population, Hong Kong’s Kowloon-Canton Railway Corporation is constructing West Rail, a HK$51.7 billion (U.S.$6.7 billion), 30.5 km rail system. West Rail is the largest infrastructure project now being undertaken in Hong Kong. Construction, which began in 1998, includes nine stations, a 32.5 ha depot, and a headquarters building. West Rail is planned to link with existing Hong Kong railway systems—including MTR, East Rail, and an existing light-rail system—to form a more integrated mass transit network. More than 90% of the West Rail line is either on viaduct or in tunnels. The line crosses a 13.4 km main viaduct, which will be the longest in Hong Kong, including six elevated stations. Tunnels account for 14.7 km of the line, and the remaining 2.4 km are at grade. Most of the tunnels will be built using drill-and-blast tunneling methods, but for one 1.8 km tunnel segment an earth-pressure-balanced tunnel-boring machine will be used—the first time a machine of this type has been used in Hong Kong. The overall design includes a number of measures to minimize noise to comply with Hong Kong’s strict noise control ordinance. West Rail is expected to be in operation by 2004.

Key concepts: Light rail, Engineering, Rail network, Rail transit, Corporation, Port (circuit theory), Track (disk drive), Drill

Related papers

Back to paper searchBrowse research topicsOriginal source
Transporting Hong Kong — Research Paper | ScholarLens