2001•Bridge design & engineeringRequires access

ON THE RIGHT TRACK

I Masterton

Open publisher page 0 citations

Abstract

When the 30.5 km long, US$6 billion West Rail link is finished, it will link Kowloon with the rapidly developing new towns of the North West New Territories which are not yet connected to Hong Kong commuter rail network. The article reports on the progress of the project that is now entering its third year of construction and is still on track for completion in 2003. Discussed is one of the most impressive features of the project: almost half of the railway, a total length of 13.4 km is being built on viaduct.

About this research paper

What this paper is about

When the 30.5 km long, US$6 billion West Rail link is finished, it will link Kowloon with the rapidly developing new towns of the North West New Territories which are not yet connected to Hong Kong commuter rail network. The article reports on the progress of the project that is now entering its third year of construction and is still on track for completion in 2003. Discussed is one of the most impressive features of the project: almost half of the railway, a total length of 13.4 km is being built on viaduct.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

When the 30.5 km long, US$6 billion West Rail link is finished, it will link Kowloon with the rapidly developing new towns of the North West New Territories which are not yet connected to Hong Kong commuter rail network. The article reports on the progress of the project that is now entering its third year of construction and is still on track for completion in 2003. Discussed is one of the most impressive features of the project: almost half of the railway, a total length of 13.4 km is being built on viaduct.

Key concepts: Track (disk drive), Engineering, Rail network, Light rail, Transport engineering, Civil engineering, Link (geometry), Forensic engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
ON THE RIGHT TRACK — Research Paper | ScholarLens