Denmark's gas system progressing on schedule
H.J. Rasmussen
Abstract
H.J. Rasmussen
Abstract
Now in the final construction phase, the 24-in., 60-mile Froslev-Egtved section of Denmark's new transmission line will operate at 1175 psi. The steel, spiral-welded pipe has an extruded-polyethylene outer coating and an internal epoxy layer. The pipeline route runs through fairly flat agricultural country with some marshy areas. Also under construction are four meter/regulator stations along the section. Denmark expects the entire transmission system to cost about $650 million.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Now in the final construction phase, the 24-in., 60-mile Froslev-Egtved section of Denmark's new transmission line will operate at 1175 psi. The steel, spiral-welded pipe has an extruded-polyethylene outer coating and an internal epoxy layer. The pipeline route runs through fairly flat agricultural country with some marshy areas. Also under construction are four meter/regulator stations along the section. Denmark expects the entire transmission system to cost about $650 million.
Key concepts: Pipeline transport, Engineering, Metre, Pipeline (software), Welding, Coating, Forensic engineering, Geology