1980Pipeline Gas J.; (United States)Requires access

Enagas now operating Spain's first gas pipeline

C.G. Zamora

Open publisher page 0 citations

Abstract

The industrialized sectors of northeast Spain are now or will soon be receiving natural gas via Spain's new gas-transmission pipeline. The first part of a 633-mile transmission network, this 450-mile pipeline runs from the LNG terminal in Barcelona south to Valencia and northwest to the Basque country. Pipe of 20, 24, 26, and 30-in. diameters installed in various sections of the line will accommodate the potential growth of the gas market in each specific region as well as the coming on-stream of other supply sources. Produced in 40-ft lengths, the pipe was coated externally with either a coal-tar enamel and fiberglass or, more recently, a polyethylene coating.

About this research paper

What this paper is about

The industrialized sectors of northeast Spain are now or will soon be receiving natural gas via Spain's new gas-transmission pipeline. The first part of a 633-mile transmission network, this 450-mile pipeline runs from the LNG terminal in Barcelona south to Valencia and northwest to the Basque country. Pipe of 20, 24, 26, and 30-in. diameters installed in various sections of the line will accommodate the potential growth of the gas market in each specific region as well as the coming on-stream of other supply sources. Produced in 40-ft lengths, the pipe was coated externally with either a coal-tar enamel and fiberglass or, more recently, a polyethylene coating.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The industrialized sectors of northeast Spain are now or will soon be receiving natural gas via Spain's new gas-transmission pipeline. The first part of a 633-mile transmission network, this 450-mile pipeline runs from the LNG terminal in Barcelona south to Valencia and northwest to the Basque country. Pipe of 20, 24, 26, and 30-in. diameters installed in various sections of the line will accommodate the potential growth of the gas market in each specific region as well as the coming on-stream of other supply sources. Produced in 40-ft lengths, the pipe was coated externally with either a coal-tar enamel and fiberglass or, more recently, a polyethylene coating.

Key concepts: Natural gas, Fuel gas, Pipeline (software), Mile, Pipeline transport, Fossil fuel, Gas pipeline, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Enagas now operating Spain's first gas pipeline — Research Paper | ScholarLens