Danish gas transmission system begins initial operations
E. Dreyer, Andrew Nielsen
Abstract
E. Dreyer, Andrew Nielsen
Abstract
Construction of a 95 km transmission line starting at the Danish/German border and running north to Egtved, with deliveries of natural gas from Danish oil and gas fields in the North Sea expected in 1984 is described. Crossing of waterways and shore areas is given special attention. A slat dome storage facility, in which each cavern, after leaching, will have a height of 250 to 300 meters and a diameter of 45 to 60 meters is examined.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Construction of a 95 km transmission line starting at the Danish/German border and running north to Egtved, with deliveries of natural gas from Danish oil and gas fields in the North Sea expected in 1984 is described. Crossing of waterways and shore areas is given special attention. A slat dome storage facility, in which each cavern, after leaching, will have a height of 250 to 300 meters and a diameter of 45 to 60 meters is examined.
Key concepts: Shore, Natural gas, German, Danish, Environmental science, Geology, Engineering, Geography