LA times getting ready to run 5. 2 Mw cogen plant
Ilia Stambler
Abstract
Ilia Stambler
Abstract
The rooftop installation, designed for base load electric power generation, will recover gas turbine exhaust for process and space heating, hot water and air conditioning at 71 percent overall thermal efficiency. The total cost of the installation will be $4 million, the energy savings 23% and the payback period less than 5 years.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The rooftop installation, designed for base load electric power generation, will recover gas turbine exhaust for process and space heating, hot water and air conditioning at 71 percent overall thermal efficiency. The total cost of the installation will be $4 million, the energy savings 23% and the payback period less than 5 years.
Key concepts: Payback period, Waste management, Environmental science, Electricity generation, Power station, Cogeneration, Air conditioning, Engineering