Great Western cogeneration saving $350,000 per year
Ilia Stambler
Abstract
Ilia Stambler
Abstract
The cogeneration installation is designed around three Garrett 831 gas turbine gensets, ISO rated at 505 KW each for continuous duty operation, and two Hitachi double effect waste heat absorption chillers. The plant provides Great Western's computer center with all of its electric power and will pay for itself within 4 to 5 years.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The cogeneration installation is designed around three Garrett 831 gas turbine gensets, ISO rated at 505 KW each for continuous duty operation, and two Hitachi double effect waste heat absorption chillers. The plant provides Great Western's computer center with all of its electric power and will pay for itself within 4 to 5 years.
Key concepts: Cogeneration, Absorption refrigerator, Waste management, Gas turbines, Electric power, Environmental science, Engineering, Waste heat