Hume highway - 1985
Allan Piper
Abstract
Allan Piper
Abstract
The nrma traffic and safety department, on 11-15 February 1985, surveyed the full length of the hume highway. The survey measured lane widths and types, signposting, linemarking and speed zones, investigated selected crash blackspots, and assessed pavement, edge and shoulder conditions. A computerised highway survey inventory system was used. Results of similar surveys of the hume highway since 1971 are compared. The report concludes that an impressive volume of roadworks was underway, with almost half the highway length now of 4 lane divided highway standard. Road geometry has improved, towns have been bypassed, and crashes reduced (a).
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The nrma traffic and safety department, on 11-15 February 1985, surveyed the full length of the hume highway. The survey measured lane widths and types, signposting, linemarking and speed zones, investigated selected crash blackspots, and assessed pavement, edge and shoulder conditions. A computerised highway survey inventory system was used. Results of similar surveys of the hume highway since 1971 are compared. The report concludes that an impressive volume of roadworks was underway, with almost half the highway length now of 4 lane divided highway standard. Road geometry has improved, towns have been bypassed, and crashes reduced (a).
Key concepts: Traffic volume, Highway system, Crash, Transport engineering, Road traffic, Highway maintenance, Geography, Engineering