The nrma traffic and safety department, on 11-15 February 1985, surveyed the full length of the hume highway. The survey measured lane widths and types, signposting, linemarking and speed zones, investigated selected crash blackspots, and assessed pavement, edge and shoulder conditions. A computerised highway survey inventory system was used. Results of similar surveys of the hume highway since 1971 are compared. The report concludes that an impressive volume of roadworks was underway, with almost half the highway length now of 4 lane divided highway standard. Road geometry has improved, towns have been bypassed, and crashes reduced (a).

About this research paper

What this paper is about

The nrma traffic and safety department, on 11-15 February 1985, surveyed the full length of the hume highway. The survey measured lane widths and types, signposting, linemarking and speed zones, investigated selected crash blackspots, and assessed pavement, edge and shoulder conditions. A computerised highway survey inventory system was used. Results of similar surveys of the hume highway since 1971 are compared. The report concludes that an impressive volume of roadworks was underway, with almost half the highway length now of 4 lane divided highway standard. Road geometry has improved, towns have been bypassed, and crashes reduced (a).

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The nrma traffic and safety department, on 11-15 February 1985, surveyed the full length of the hume highway. The survey measured lane widths and types, signposting, linemarking and speed zones, investigated selected crash blackspots, and assessed pavement, edge and shoulder conditions. A computerised highway survey inventory system was used. Results of similar surveys of the hume highway since 1971 are compared. The report concludes that an impressive volume of roadworks was underway, with almost half the highway length now of 4 lane divided highway standard. Road geometry has improved, towns have been bypassed, and crashes reduced (a).

Key concepts: Traffic volume, Highway system, Crash, Transport engineering, Road traffic, Highway maintenance, Geography, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Hume highway - 1985 — Research Paper | ScholarLens