West Coast Route Modernisation '125' milestone
Jamie A. Gough
Abstract
Jamie A. Gough
Abstract
The author details the wide-ranging rail/network upgrading of the West Coast line in preparation for the introduction of the Pendolino 125 timetable. Work required includes signalling at Hemel Hempstead, improvements at Nuneaton and new track layout at Rugby and Birmingham. At the Stafford section a simplified layout will allow 125 mph operations although work is thought unlikely to start before 2008. Over the northern fells section of the line, leading to the lowlands of Scotland, a change of policy concerns the decision to set a maximum speed of 110 mph on the more curved sections with the intention of bringing the 90 mph sections up to this level. Track speed will drop to 60 mph between Carluke and Motherwell due to previous mining subsidence as this section is said to need much stabilization.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The author details the wide-ranging rail/network upgrading of the West Coast line in preparation for the introduction of the Pendolino 125 timetable. Work required includes signalling at Hemel Hempstead, improvements at Nuneaton and new track layout at Rugby and Birmingham. At the Stafford section a simplified layout will allow 125 mph operations although work is thought unlikely to start before 2008. Over the northern fells section of the line, leading to the lowlands of Scotland, a change of policy concerns the decision to set a maximum speed of 110 mph on the more curved sections with the intention of bringing the 90 mph sections up to this level. Track speed will drop to 60 mph between Carluke and Motherwell due to previous mining subsidence as this section is said to need much stabilization.
Key concepts: Milestone, Section (typography), Modernization theory, Work (physics), Track (disk drive), West coast, Engineering, Transport engineering