The modernisation of the West Coast main line track route is detailed, particularly the Crewe-Manchester section. Although it was originally planned to complete all the work of the section at the same time, it is said to have proved impossible to schedule the resignalling works along with the new track works. Although a maximum speed of 60 mph has been imposed over the Crewe-Sandbach section, due to subsidence problems, track rebuilding should allow a line speed of 100 mph. Further rebuilding operations are mentioned between Crewe-Sandbach and Cheadle Hulme-Stockport. Modernisation works are also examined at the Slade Lane junction carrying traffic to Manchester Airport where platform capacity is to be increased. No changes are planned for Manchester Piccadilly so Trans-Pennine traffic from Leeds will continue to cross the entire layout on the level.

About this research paper

What this paper is about

The modernisation of the West Coast main line track route is detailed, particularly the Crewe-Manchester section. Although it was originally planned to complete all the work of the section at the same time, it is said to have proved impossible to schedule the resignalling works along with the new track works. Although a maximum speed of 60 mph has been imposed over the Crewe-Sandbach section, due to subsidence problems, track rebuilding should allow a line speed of 100 mph. Further rebuilding operations are mentioned between Crewe-Sandbach and Cheadle Hulme-Stockport. Modernisation works are also examined at the Slade Lane junction carrying traffic to Manchester Airport where platform capacity is to be increased. No changes are planned for Manchester Piccadilly so Trans-Pennine traffic from Leeds will continue to cross the entire layout on the level.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The modernisation of the West Coast main line track route is detailed, particularly the Crewe-Manchester section. Although it was originally planned to complete all the work of the section at the same time, it is said to have proved impossible to schedule the resignalling works along with the new track works. Although a maximum speed of 60 mph has been imposed over the Crewe-Sandbach section, due to subsidence problems, track rebuilding should allow a line speed of 100 mph. Further rebuilding operations are mentioned between Crewe-Sandbach and Cheadle Hulme-Stockport. Modernisation works are also examined at the Slade Lane junction carrying traffic to Manchester Airport where platform capacity is to be increased. No changes are planned for Manchester Piccadilly so Trans-Pennine traffic from Leeds will continue to cross the entire layout on the level.

Key concepts: Modernization theory, Section (typography), Track (disk drive), Schedule, Transport engineering, Line (geometry), Work (physics), Engineering