1977OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Westcoast to Mid-continent pipeline project

V.P. Halter

Open publisher page 0 citations

Abstract

A discussion of engineering/management phases of developing a crude oil pipeline system from the Los Angeles area to move surplus (Alaskan) crude oil to Midwest, Gulf Coast, and East Coast refineries covers feasibility studies of obtaining and using existing pipeline systems which are moving gas or oil westward; description of one natural gas pipeline system owned by Southern California Gas Co. and another owned by El Paso Natural Gas Co., of which a total of 788 mi are proposed for the crude oil service; details of the existing pipeline systems; description of new facilities to be added, including a total of 194 mi of 42 in. line and 18 pump stations; documents needed to obtain endorsements for the project and subsequent permits; the Environmental Impact Assessment prepared by the owner companies; numerous permit requirements; special problems when converting from natural gas to crude oil; and completion of the final design, with utilities and other support facilities.

About this research paper

What this paper is about

A discussion of engineering/management phases of developing a crude oil pipeline system from the Los Angeles area to move surplus (Alaskan) crude oil to Midwest, Gulf Coast, and East Coast refineries covers feasibility studies of obtaining and using existing pipeline systems which are moving gas or oil westward; description of one natural gas pipeline system owned by Southern California Gas Co. and another owned by El Paso Natural Gas Co., of which a total of 788 mi are proposed for the crude oil service; details of the existing pipeline systems; description of new facilities to be added, including a total of 194 mi of 42 in. line and 18 pump stations; documents needed to obtain endorsements for the project and subsequent permits; the Environmental Impact Assessment prepared by the owner companies; numerous permit requirements; special problems when converting from natural gas to crude oil; and completion of the final design, with utilities and other support facilities.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A discussion of engineering/management phases of developing a crude oil pipeline system from the Los Angeles area to move surplus (Alaskan) crude oil to Midwest, Gulf Coast, and East Coast refineries covers feasibility studies of obtaining and using existing pipeline systems which are moving gas or oil westward; description of one natural gas pipeline system owned by Southern California Gas Co. and another owned by El Paso Natural Gas Co., of which a total of 788 mi are proposed for the crude oil service; details of the existing pipeline systems; description of new facilities to be added, including a total of 194 mi of 42 in. line and 18 pump stations; documents needed to obtain endorsements for the project and subsequent permits; the Environmental Impact Assessment prepared by the owner companies; numerous permit requirements; special problems when converting from natural gas to crude oil; and completion of the final design, with utilities and other support facilities.

Key concepts: Natural gas, Pipeline transport, Pipeline (software), Oil refinery, Crude oil, Petroleum, Petroleum engineering, Liquefied natural gas

Related papers

Back to paper searchBrowse research topicsOriginal source
Westcoast to Mid-continent pipeline project — Research Paper | ScholarLens