1985OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Pacific Texas pipeline to carry 900,000 barrels of crude per day

Michael J. Sotak

Open publisher page 0 citations

Abstract

The proposed Pacific Texas pipeline to bring crude oil from Los Angeles to Midland, Texas will be the largest pipeline construction project since the trans Alaska pipeline. The project will entail major construction in the Port of Los Angeles, 1026 miles of 42-inch pipeline, 11 pump station, and terminal facilities at Midland. The pipeline should lower oil transport costs, shorten delivery time, and create a shipping line within US boundaries. Environmental effects have been a concern during the permitting process, particularly at the Port of Los Angeles. The author describes the project's components and its economic and regulatory aspects. 2 figures, 1 table.

About this research paper

What this paper is about

The proposed Pacific Texas pipeline to bring crude oil from Los Angeles to Midland, Texas will be the largest pipeline construction project since the trans Alaska pipeline. The project will entail major construction in the Port of Los Angeles, 1026 miles of 42-inch pipeline, 11 pump station, and terminal facilities at Midland. The pipeline should lower oil transport costs, shorten delivery time, and create a shipping line within US boundaries. Environmental effects have been a concern during the permitting process, particularly at the Port of Los Angeles. The author describes the project's components and its economic and regulatory aspects. 2 figures, 1 table.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The proposed Pacific Texas pipeline to bring crude oil from Los Angeles to Midland, Texas will be the largest pipeline construction project since the trans Alaska pipeline. The project will entail major construction in the Port of Los Angeles, 1026 miles of 42-inch pipeline, 11 pump station, and terminal facilities at Midland. The pipeline should lower oil transport costs, shorten delivery time, and create a shipping line within US boundaries. Environmental effects have been a concern during the permitting process, particularly at the Port of Los Angeles. The author describes the project's components and its economic and regulatory aspects. 2 figures, 1 table.

Key concepts: Pipeline (software), Port (circuit theory), Crude oil, Pipeline transport, Engineering, Table (database), Terminal (telecommunication), Petroleum engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Pacific Texas pipeline to carry 900,000 barrels of crude per day — Research Paper | ScholarLens