1969Pipe line industryRequires access

BECHTEL COMPLETES SEA LINES FOR OCCIDENTAL'S LIBYAN OIL

D. Deason

Open publisher page 0 citations

Abstract

Completion of a number of new projects by Arabian Bechtel Corp. has increased Occidental Oil Co.'s production capacity, storage and handling facilities from the Idris D and 'Augila fields to the 1 million bbl/day mark. The latest project was the installation of two 48 in. and three 42 in. undersea pipelines having 0.75 and 0.5 in. thicknesses, respectively from the Zueitina Marine Terminal to tanker mooring buoys located more than 3 mi offshore. All pipe was spiral, API 5LS grade B material. The joints were welded into 1500 ft sections, wrapped, coated with concrete to give a negative buoyancy of 15 lb/ft empty, and pulled offshore. A rubber tired shoe system was used to maintain tension, and a laser and target assured exact alignment. The pipelines were buried through the surf to a point where the water depth reached 16.5 ft. A 72 in. pipeline will carry the crude from the trunkline to a 560,000 bbl storage tank or from the tank to the sea lines. Occidental's latest Libyan project is for a plant to recover 69,000 bbl/day of natural gasoline and LPG from gas produced in association with oil at the Idris field. The total cost of this project and a 135 mi 20 in. products pipeline which will parallel the existing crude oil line will be $60 million.

About this research paper

What this paper is about

Completion of a number of new projects by Arabian Bechtel Corp. has increased Occidental Oil Co.'s production capacity, storage and handling facilities from the Idris D and 'Augila fields to the 1 million bbl/day mark. The latest project was the installation of two 48 in. and three 42 in. undersea pipelines having 0.75 and 0.5 in. thicknesses, respectively from the Zueitina Marine Terminal to tanker mooring buoys located more than 3 mi offshore. All pipe was spiral, API 5LS grade B material. The joints were welded into 1500 ft sections, wrapped, coated with concrete to give a negative buoyancy of 15 lb/ft empty, and pulled offshore. A rubber tired shoe system was used to maintain tension, and a laser and target assured exact alignment. The pipelines were buried through the surf to a point where the water depth reached 16.5 ft. A 72 in. pipeline will carry the crude from the trunkline to a 560,000 bbl storage tank or from the tank to the sea lines. Occidental's latest Libyan project is for a plant to recover 69,000 bbl/day of natural gasoline and LPG from gas produced in association with oil at the Idris field. The total cost of this project and a 135 mi 20 in. products pipeline which will parallel the existing crude oil line will be $60 million.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Completion of a number of new projects by Arabian Bechtel Corp. has increased Occidental Oil Co.'s production capacity, storage and handling facilities from the Idris D and 'Augila fields to the 1 million bbl/day mark. The latest project was the installation of two 48 in. and three 42 in. undersea pipelines having 0.75 and 0.5 in. thicknesses, respectively from the Zueitina Marine Terminal to tanker mooring buoys located more than 3 mi offshore. All pipe was spiral, API 5LS grade B material. The joints were welded into 1500 ft sections, wrapped, coated with concrete to give a negative buoyancy of 15 lb/ft empty, and pulled offshore. A rubber tired shoe system was used to maintain tension, and a laser and target assured exact alignment. The pipelines were buried through the surf to a point where the water depth reached 16.5 ft. A 72 in. pipeline will carry the crude from the trunkline to a 560,000 bbl storage tank or from the tank to the sea lines. Occidental's latest Libyan project is for a plant to recover 69,000 bbl/day of natural gasoline and LPG from gas produced in association with oil at the Idris field. The total cost of this project and a 135 mi 20 in. products pipeline which will parallel the existing crude oil line will be $60 million.

Key concepts: Submarine pipeline, Pipeline transport, Petroleum engineering, Petroleum, Crude oil, Engineering, Marine engineering, Natural gas

Related papers

Back to paper searchBrowse research topicsOriginal source
BECHTEL COMPLETES SEA LINES FOR OCCIDENTAL'S LIBYAN OIL — Research Paper | ScholarLens