1978Pipe line industryRequires access

LOOP Inc. (Louisiana Offshore Oil Port Inc. ) to start onshore construction this year

W.P. Binger

Open publisher page 0 citations

Abstract

A discussion covers the LOOP project to construct an offshore pipeline system, which will connect with onshore facilities at Fourchon, La., and two onshore pipelines (26 mi 48 in. Clovelly line and 53 mi 48 in. LOCAP line) connecting Fourchon with the existing Capline system at St. James, La.; the three-phase construction schedule, the first phase due to begin in the third quarter of 1978 with, e.g., onshore pipeline and salt dome storage facility construction which will yield an expected initial throughput of 1.4 million bbl/day; the marine terminal complex, consisting of control and pumping platforms, and three 7000 hp pumps to operate the system at 45,000-100,000 bbl/hr; the offshore lines, including lines between single-point mooring units and the pumping platform, the 21 mi 48 in. pipe to Fourchon, and corrosion protection of lines by an asphalt-sand mixture or a semiplasticized coal-tar enamel; the onshore system, including the Fourchon booster station, Clovelly and LOCAP pipelines and brine disposal line; construction techniques for installing onshore lines, e.g., the push-ditch method; storage terminals, including units for 56 million bbl of oil and 25 million bbl of brine, pumping facilities, and computer and communications equipment.

About this research paper

What this paper is about

A discussion covers the LOOP project to construct an offshore pipeline system, which will connect with onshore facilities at Fourchon, La., and two onshore pipelines (26 mi 48 in. Clovelly line and 53 mi 48 in. LOCAP line) connecting Fourchon with the existing Capline system at St. James, La.; the three-phase construction schedule, the first phase due to begin in the third quarter of 1978 with, e.g., onshore pipeline and salt dome storage facility construction which will yield an expected initial throughput of 1.4 million bbl/day; the marine terminal complex, consisting of control and pumping platforms, and three 7000 hp pumps to operate the system at 45,000-100,000 bbl/hr; the offshore lines, including lines between single-point mooring units and the pumping platform, the 21 mi 48 in. pipe to Fourchon, and corrosion protection of lines by an asphalt-sand mixture or a semiplasticized coal-tar enamel; the onshore system, including the Fourchon booster station, Clovelly and LOCAP pipelines and brine disposal line; construction techniques for installing onshore lines, e.g., the push-ditch method; storage terminals, including units for 56 million bbl of oil and 25 million bbl of brine, pumping facilities, and computer and communications equipment.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A discussion covers the LOOP project to construct an offshore pipeline system, which will connect with onshore facilities at Fourchon, La., and two onshore pipelines (26 mi 48 in. Clovelly line and 53 mi 48 in. LOCAP line) connecting Fourchon with the existing Capline system at St. James, La.; the three-phase construction schedule, the first phase due to begin in the third quarter of 1978 with, e.g., onshore pipeline and salt dome storage facility construction which will yield an expected initial throughput of 1.4 million bbl/day; the marine terminal complex, consisting of control and pumping platforms, and three 7000 hp pumps to operate the system at 45,000-100,000 bbl/hr; the offshore lines, including lines between single-point mooring units and the pumping platform, the 21 mi 48 in. pipe to Fourchon, and corrosion protection of lines by an asphalt-sand mixture or a semiplasticized coal-tar enamel; the onshore system, including the Fourchon booster station, Clovelly and LOCAP pipelines and brine disposal line; construction techniques for installing onshore lines, e.g., the push-ditch method; storage terminals, including units for 56 million bbl of oil and 25 million bbl of brine, pumping facilities, and computer and communications equipment.

Key concepts: Submarine pipeline, Pipeline transport, Engineering, Marine engineering, Petroleum, Petroleum engineering, Geology, Environmental engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
LOOP Inc. (Louisiana Offshore Oil Port Inc. ) to start onshore construction this year — Research Paper | ScholarLens