2014•Austroads Bridge Conference, 9th, 2014, Sydney, New South Wales, AustraliaRequires access

Fatigue-detailing of skewed steel-through-girder rail bridges: Regional Rail Project, Melbourne

Bruce Gibbens

Open publisher page 0 citations

Abstract

The south west of Melbourne has experienced huge residential development, and a corresponding increase in rail patronage. The Regional Rail Project effected the separation of Regional and Metropolitan lines between Southern Cross Station, and Werribee, 50 kilometres distant. This separation has allowed an increase in the number of lpassenger journeysr, and has also reduced travel times. Two additional Regional (country) tracks were also provided. This paper is written in respect of Works Package C, for which a number of similar steel through-girder rail bridges have been constructed. These bridges have skewed abutments. Only the rail bridge over Anderson Road is covered by this paper. Best-practice approaches to fatigue detailing are discussed, as well as an unusual semi-empirical method by which the lcapacity-protectionr of a concrete column-to-crosshead knee-connection was demonstrated.

About this research paper

What this paper is about

The south west of Melbourne has experienced huge residential development, and a corresponding increase in rail patronage. The Regional Rail Project effected the separation of Regional and Metropolitan lines between Southern Cross Station, and Werribee, 50 kilometres distant. This separation has allowed an increase in the number of lpassenger journeysr, and has also reduced travel times. Two additional Regional (country) tracks were also provided. This paper is written in respect of Works Package C, for which a number of similar steel through-girder rail bridges have been constructed. These bridges have skewed abutments. Only the rail bridge over Anderson Road is covered by this paper. Best-practice approaches to fatigue detailing are discussed, as well as an unusual semi-empirical method by which the lcapacity-protectionr of a concrete column-to-crosshead knee-connection was demonstrated.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The south west of Melbourne has experienced huge residential development, and a corresponding increase in rail patronage. The Regional Rail Project effected the separation of Regional and Metropolitan lines between Southern Cross Station, and Werribee, 50 kilometres distant. This separation has allowed an increase in the number of lpassenger journeysr, and has also reduced travel times. Two additional Regional (country) tracks were also provided. This paper is written in respect of Works Package C, for which a number of similar steel through-girder rail bridges have been constructed. These bridges have skewed abutments. Only the rail bridge over Anderson Road is covered by this paper. Best-practice approaches to fatigue detailing are discussed, as well as an unusual semi-empirical method by which the lcapacity-protectionr of a concrete column-to-crosshead knee-connection was demonstrated.

Key concepts: Bridge (graph theory), Metropolitan area, Girder, Engineering, Forensic engineering, Civil engineering, Geography, Archaeology