U. S. -Canada pipeline contractors laid 8,665. 78 miles; foreign work 23,696. 3 miles in 1976
R. McNeil
Abstract
R. McNeil
Abstract
U.S. and Canadian pipeline construction for 1976 showed a gain of 1148 miles over the 1975 figure for projects awarded, under construction, or completed. Of the U.S. total of 6224 miles, natural-gas lines account for over 3000 miles. In Canada, 1921 miles of the 2441 total will be for gas lines. Foreign construction showed a large increase, with 23,638 miles laid in 1976 compared to 17,804 in 1975. Natural-gas lines accounted for over 44% of foreign installations. Extensive tabulations break down these totals by company and pipe diameter for natural-gas, products, and crude pipelines.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
U.S. and Canadian pipeline construction for 1976 showed a gain of 1148 miles over the 1975 figure for projects awarded, under construction, or completed. Of the U.S. total of 6224 miles, natural-gas lines account for over 3000 miles. In Canada, 1921 miles of the 2441 total will be for gas lines. Foreign construction showed a large increase, with 23,638 miles laid in 1976 compared to 17,804 in 1975. Natural-gas lines accounted for over 44% of foreign installations. Extensive tabulations break down these totals by company and pipe diameter for natural-gas, products, and crude pipelines.
Key concepts: Natural gas, Pipeline transport, Work (physics), Pipeline (software), Gas pipeline, Engineering, Environmental science, Forensic engineering