BALLASTLESS TRACK APPLICATION IN EXISTING TUNNELS - EXPERIENCE GAINED ON AUSTRIAN FEDERAL RAILWAYS

R Schilder

Open publisher page 0 citations

Abstract

A great number of ballastless track applications can be found in tunnels. These ballastless tracks, built during the past three decades, were mainly laid in new or short tunnels and in high-speed line applications. However, on Austrian Federal Railways (OBB) more than 10 km of ballastless track has been installed in two existing long tunnels. This article looks at the ballstless track in the Tauern tunnel, a classical summit and base tunnel running through the Alps with a total length of 8,550 m. The construction of the tunnel was completed in 1909.

About this research paper

What this paper is about

A great number of ballastless track applications can be found in tunnels. These ballastless tracks, built during the past three decades, were mainly laid in new or short tunnels and in high-speed line applications. However, on Austrian Federal Railways (OBB) more than 10 km of ballastless track has been installed in two existing long tunnels. This article looks at the ballstless track in the Tauern tunnel, a classical summit and base tunnel running through the Alps with a total length of 8,550 m. The construction of the tunnel was completed in 1909.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A great number of ballastless track applications can be found in tunnels. These ballastless tracks, built during the past three decades, were mainly laid in new or short tunnels and in high-speed line applications. However, on Austrian Federal Railways (OBB) more than 10 km of ballastless track has been installed in two existing long tunnels. This article looks at the ballstless track in the Tauern tunnel, a classical summit and base tunnel running through the Alps with a total length of 8,550 m. The construction of the tunnel was completed in 1909.

Key concepts: Track (disk drive), Summit, Engineering, Transport engineering, Railway tunnel, Forensic engineering, Civil engineering, Mechanical engineering