DEVELOPMENT AND IMPLEMENTATION OF TRAFFIC CONTROL PLANS FOR HIGHWAY WORK ZONES

Jerry L Graham, J Migletz

Open publisher page 5 citations

Abstract

This synthesis report will be of interest to traffic control plan designers and administrators; highway engineers (traffic, safety, project, and resident construction); highway construction contractor personnel; and consultants, inspectors, and technicians involved with the design, implementation, and revision of highway work zone traffic control plans. Information on the state of the practice in traffic control plan (TCP) management methods is presented. The emphasis of the synthesis is on innovative and efficient methods that lead to safe traffic control in work zones. The document emphasizes efficient management of the four stages (predesign planning, design, implementation, and revision) of TCPs for different classes of highways and streets in both rural and urban environments.

About this research paper

What this paper is about

This synthesis report will be of interest to traffic control plan designers and administrators; highway engineers (traffic, safety, project, and resident construction); highway construction contractor personnel; and consultants, inspectors, and technicians involved with the design, implementation, and revision of highway work zone traffic control plans. Information on the state of the practice in traffic control plan (TCP) management methods is presented. The emphasis of the synthesis is on innovative and efficient methods that lead to safe traffic control in work zones. The document emphasizes efficient management of the four stages (predesign planning, design, implementation, and revision) of TCPs for different classes of highways and streets in both rural and urban environments.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This synthesis report will be of interest to traffic control plan designers and administrators; highway engineers (traffic, safety, project, and resident construction); highway construction contractor personnel; and consultants, inspectors, and technicians involved with the design, implementation, and revision of highway work zone traffic control plans. Information on the state of the practice in traffic control plan (TCP) management methods is presented. The emphasis of the synthesis is on innovative and efficient methods that lead to safe traffic control in work zones. The document emphasizes efficient management of the four stages (predesign planning, design, implementation, and revision) of TCPs for different classes of highways and streets in both rural and urban environments.

Key concepts: Plan (archaeology), Transport engineering, Work (physics), Control (management), Highway engineering, Work zone, Engineering, Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
DEVELOPMENT AND IMPLEMENTATION OF TRAFFIC CONTROL PLANS FOR HIGHWAY WORK ZONES — Research Paper | ScholarLens