1986Unpublished venueRequires access

EVALUATION OF TRAFFIC CONTROL PLANS AT RECONSTRUCTION SITES. FINAL REPORT

C L Dudek, Suzanne H Richards

Open publisher page 0 citations

Abstract

A considerable amount of time and effort are being spent by Department personnel to prepare Traffic Control Plans (TCPs). Thus, there is a need to evaluate TCP procedures and identify needed improvement. In addition, the complexity of reconstruction work zones requires that a variety of traffic handling approaches both standard and innovative be utilized. Toward these ends, data were collected by a series of visits to several work zone sites in Texas, interviews with numerous District personnel, review of several TCPs for worksites in Texas and several field studies. Also, the study staff worked with District 12 (Houston) in organizing a Special Traffic Handling Crew, and in developing and implementing work zone traffic management strategies. This is the third and final report in a 3-report series. The other reports are: Report 321-1 -- Catalog of Traffic Control Strategies and Devices; and, Report 321-2 -- Guidelines for Preparing Work Zone Traffic Control Plans.

About this research paper

What this paper is about

A considerable amount of time and effort are being spent by Department personnel to prepare Traffic Control Plans (TCPs). Thus, there is a need to evaluate TCP procedures and identify needed improvement. In addition, the complexity of reconstruction work zones requires that a variety of traffic handling approaches both standard and innovative be utilized. Toward these ends, data were collected by a series of visits to several work zone sites in Texas, interviews with numerous District personnel, review of several TCPs for worksites in Texas and several field studies. Also, the study staff worked with District 12 (Houston) in organizing a Special Traffic Handling Crew, and in developing and implementing work zone traffic management strategies. This is the third and final report in a 3-report series. The other reports are: Report 321-1 -- Catalog of Traffic Control Strategies and Devices; and, Report 321-2 -- Guidelines for Preparing Work Zone Traffic Control Plans.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A considerable amount of time and effort are being spent by Department personnel to prepare Traffic Control Plans (TCPs). Thus, there is a need to evaluate TCP procedures and identify needed improvement. In addition, the complexity of reconstruction work zones requires that a variety of traffic handling approaches both standard and innovative be utilized. Toward these ends, data were collected by a series of visits to several work zone sites in Texas, interviews with numerous District personnel, review of several TCPs for worksites in Texas and several field studies. Also, the study staff worked with District 12 (Houston) in organizing a Special Traffic Handling Crew, and in developing and implementing work zone traffic management strategies. This is the third and final report in a 3-report series. The other reports are: Report 321-1 -- Catalog of Traffic Control Strategies and Devices; and, Report 321-2 -- Guidelines for Preparing Work Zone Traffic Control Plans.

Key concepts: Work (physics), Transport engineering, Control (management), Crew, Work zone, Variety (cybernetics), Engineering, Operations research

Related papers

Back to paper searchBrowse research topicsOriginal source
EVALUATION OF TRAFFIC CONTROL PLANS AT RECONSTRUCTION SITES. FINAL REPORT — Research Paper | ScholarLens