Over hill, over dale: Contractor overcomes Iowa hills to be a Hayes finalist

Jeff Zagoudis

Open publisher page 0 citations

Abstract

In order to qualify as a finalist for the National Asphalt Pavement Association's 2015 Hayes Award, the Norris Asphalt Paving Company faced an uphill climb on its US 34 two-lane highway project in Wapello County, Iowa. The slope and smoothness of the highway was required by the Iowa department of transportation to be corrected over a 9.5 mile stretch, and cold in-place recycling (CIR) was the prescribed method for doing so. The width of the shoulders also needed to be standardized, and more than 13,000 feet of new cable guardrail was installed. The challenge was that due to the hilly, wooded environment of this section of US 34, numerous twists and turns precluded passing for long stretches, thus requiring an extra lane added every mile or two for the purpose of passing. Climbing lanes also ran through some of the most sloped part of the roadway with overlap on a significant portion of the job, making the achievement of optimal, uniform smoothness difficult. The topography also was cause for concern from a stability standpoint, with a lot of fill sections. In spite of these challenges, the completed work met with all stakeholders' approval and satisfaction.

About this research paper

What this paper is about

In order to qualify as a finalist for the National Asphalt Pavement Association's 2015 Hayes Award, the Norris Asphalt Paving Company faced an uphill climb on its US 34 two-lane highway project in Wapello County, Iowa. The slope and smoothness of the highway was required by the Iowa department of transportation to be corrected over a 9.5 mile stretch, and cold in-place recycling (CIR) was the prescribed method for doing so. The width of the shoulders also needed to be standardized, and more than 13,000 feet of new cable guardrail was installed. The challenge was that due to the hilly, wooded environment of this section of US 34, numerous twists and turns precluded passing for long stretches, thus requiring an extra lane added every mile or two for the purpose of passing. Climbing lanes also ran through some of the most sloped part of the roadway with overlap on a significant portion of the job, making the achievement of optimal, uniform smoothness difficult. The topography also was cause for concern from a stability standpoint, with a lot of fill sections. In spite of these challenges, the completed work met with all stakeholders' approval and satisfaction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to qualify as a finalist for the National Asphalt Pavement Association's 2015 Hayes Award, the Norris Asphalt Paving Company faced an uphill climb on its US 34 two-lane highway project in Wapello County, Iowa. The slope and smoothness of the highway was required by the Iowa department of transportation to be corrected over a 9.5 mile stretch, and cold in-place recycling (CIR) was the prescribed method for doing so. The width of the shoulders also needed to be standardized, and more than 13,000 feet of new cable guardrail was installed. The challenge was that due to the hilly, wooded environment of this section of US 34, numerous twists and turns precluded passing for long stretches, thus requiring an extra lane added every mile or two for the purpose of passing. Climbing lanes also ran through some of the most sloped part of the roadway with overlap on a significant portion of the job, making the achievement of optimal, uniform smoothness difficult. The topography also was cause for concern from a stability standpoint, with a lot of fill sections. In spite of these challenges, the completed work met with all stakeholders' approval and satisfaction.

Key concepts: Mile, Asphalt, Smoothness, Transport engineering, Engineering, Shoulders, Work (physics), Climbing

Related papers

Back to paper searchBrowse research topicsOriginal source
Over hill, over dale: Contractor overcomes Iowa hills to be a Hayes finalist — Research Paper | ScholarLens