2000•Unpublished venueRequires access

The US 59 Corridor Master Plan: A Success Story in East Texas

Tina Walker

Open publisher page 0 citations

Abstract

Corridor analysis, corridor selection and schematic development for 42 miles of new location freeway for the Lufkin District of the Texas Department of Transportation (TxDOT) were recently completed. The facility has been designed to relieve the existing U.S. 59 highway of regional and interstate traffic that is anticipated over a 30 year planning horizon. The proposed facility will ultimately be designated as Interstate 69. TxDOT used a new strategy for project development that incorporated several characteristics of a Major Investment Study and a few innovative techniques to accomplish the study. This paper will present an overview of the successful strategy and innovative techniques in an effort to provide practitioners with alternatives for consideration on other large corridor studies.

About this research paper

What this paper is about

Corridor analysis, corridor selection and schematic development for 42 miles of new location freeway for the Lufkin District of the Texas Department of Transportation (TxDOT) were recently completed. The facility has been designed to relieve the existing U.S. 59 highway of regional and interstate traffic that is anticipated over a 30 year planning horizon. The proposed facility will ultimately be designated as Interstate 69. TxDOT used a new strategy for project development that incorporated several characteristics of a Major Investment Study and a few innovative techniques to accomplish the study. This paper will present an overview of the successful strategy and innovative techniques in an effort to provide practitioners with alternatives for consideration on other large corridor studies.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Corridor analysis, corridor selection and schematic development for 42 miles of new location freeway for the Lufkin District of the Texas Department of Transportation (TxDOT) were recently completed. The facility has been designed to relieve the existing U.S. 59 highway of regional and interstate traffic that is anticipated over a 30 year planning horizon. The proposed facility will ultimately be designated as Interstate 69. TxDOT used a new strategy for project development that incorporated several characteristics of a Major Investment Study and a few innovative techniques to accomplish the study. This paper will present an overview of the successful strategy and innovative techniques in an effort to provide practitioners with alternatives for consideration on other large corridor studies.

Key concepts: Transport engineering, Plan (archaeology), Investment (military), Strategic planning, Schematic, Environmental planning, Business, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The US 59 Corridor Master Plan: A Success Story in East Texas — Research Paper | ScholarLens