BRIDGE MANAGEMENT PROBLEMS AND OPTIONS

Timothy K. Williams

Open publisher page 0 citations

Abstract

This paper discusses some of the findings of the UK's 15 year bridge rehabilitation programme started in 1988. The assessment part of the programme has revealed numerous hitherto unknown or unquantified structural deficiencies which have occurred as a result of original under-design for modern conditions or through subsequent deterioration. The areas considered include a) material strength, b) shear, c) bending, d) loading, e) structural form and f) lack of records. Aspects to be considered in carrying out interim measures are discussed. Other components to be inspected including post tensioning, parapets and support are briefly discussed. For the covering abstract see IRRD 898092.

About this research paper

What this paper is about

This paper discusses some of the findings of the UK's 15 year bridge rehabilitation programme started in 1988. The assessment part of the programme has revealed numerous hitherto unknown or unquantified structural deficiencies which have occurred as a result of original under-design for modern conditions or through subsequent deterioration. The areas considered include a) material strength, b) shear, c) bending, d) loading, e) structural form and f) lack of records. Aspects to be considered in carrying out interim measures are discussed. Other components to be inspected including post tensioning, parapets and support are briefly discussed. For the covering abstract see IRRD 898092.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper discusses some of the findings of the UK's 15 year bridge rehabilitation programme started in 1988. The assessment part of the programme has revealed numerous hitherto unknown or unquantified structural deficiencies which have occurred as a result of original under-design for modern conditions or through subsequent deterioration. The areas considered include a) material strength, b) shear, c) bending, d) loading, e) structural form and f) lack of records. Aspects to be considered in carrying out interim measures are discussed. Other components to be inspected including post tensioning, parapets and support are briefly discussed. For the covering abstract see IRRD 898092.

Key concepts: Interim, Engineering, Bridge (graph theory), Forensic engineering, Structural engineering, Civil engineering, Geography, Archaeology

Related papers

Back to paper searchBrowse research topicsOriginal source
BRIDGE MANAGEMENT PROBLEMS AND OPTIONS — Research Paper | ScholarLens