PAVING THE 385-MILE JAMES BAY ACCESS ROAD WITH 300/400 PENETRATION ASPHALT CEMENT

L M Lefehvre, Alexandre Dion, Richard N. Langlois, D. Champagne, N W Mcleod

Open publisher page 0 citations

Abstract

The newly constructed James Bay Access Road provides the only overland transportation route from the ends of both railroad and highway at Matagami, Quebec, to the 16-billion dollar hydroelectric project now being built on the Quebec side of James Bay about 400 miles farther north. Just 15 months were allowed for the location, design, and preparation of contract documents for the 450 miles of road to be built and gravelled, and only 450 working days were scheduled for its construction. This paper presents a general review of the entire project with respect to the design and construction procedures employed, the traffic being carried, the rationale for selecting 300/400 penetration asphalt cement, a summary of laboratory data accumulated during pavement construction control, information obtained on recently cored pavement samples, and the results of rut depth measurements and of a low temperature transverse pavement crack survey conducted in November 1977.

About this research paper

What this paper is about

The newly constructed James Bay Access Road provides the only overland transportation route from the ends of both railroad and highway at Matagami, Quebec, to the 16-billion dollar hydroelectric project now being built on the Quebec side of James Bay about 400 miles farther north. Just 15 months were allowed for the location, design, and preparation of contract documents for the 450 miles of road to be built and gravelled, and only 450 working days were scheduled for its construction. This paper presents a general review of the entire project with respect to the design and construction procedures employed, the traffic being carried, the rationale for selecting 300/400 penetration asphalt cement, a summary of laboratory data accumulated during pavement construction control, information obtained on recently cored pavement samples, and the results of rut depth measurements and of a low temperature transverse pavement crack survey conducted in November 1977.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The newly constructed James Bay Access Road provides the only overland transportation route from the ends of both railroad and highway at Matagami, Quebec, to the 16-billion dollar hydroelectric project now being built on the Quebec side of James Bay about 400 miles farther north. Just 15 months were allowed for the location, design, and preparation of contract documents for the 450 miles of road to be built and gravelled, and only 450 working days were scheduled for its construction. This paper presents a general review of the entire project with respect to the design and construction procedures employed, the traffic being carried, the rationale for selecting 300/400 penetration asphalt cement, a summary of laboratory data accumulated during pavement construction control, information obtained on recently cored pavement samples, and the results of rut depth measurements and of a low temperature transverse pavement crack survey conducted in November 1977.

Key concepts: Asphalt, Bay, Engineering, Civil engineering, Road construction, Forensic engineering, Geography, Archaeology