2001Pavement: Advancing the World of PavementsRequires access

ROCKY MOUNTAIN PAVING

T Linzmeier

Open publisher page 0 citations

Abstract

The article describes the challenges faced by a Colorado company when it overlayed a 25.5 mile stretch of Highway 149 south of Gunnison, Colorado, in the Rocky Mountains. The winding, two lane highway, complete with blind corners, was kept open for traffic during paving by using a pilot car to lead traffic from one end of construction to the other. The high elevation caused difficulties because of afternoon rainstorms and cool morning temperatures. Paving could only take place when it was dry and above 40 degrees. Details of the construction project, which included a one-inch leveling course of asphalt with a two-inch overlay of asphalt cement, are included.

About this research paper

What this paper is about

The article describes the challenges faced by a Colorado company when it overlayed a 25.5 mile stretch of Highway 149 south of Gunnison, Colorado, in the Rocky Mountains. The winding, two lane highway, complete with blind corners, was kept open for traffic during paving by using a pilot car to lead traffic from one end of construction to the other. The high elevation caused difficulties because of afternoon rainstorms and cool morning temperatures. Paving could only take place when it was dry and above 40 degrees. Details of the construction project, which included a one-inch leveling course of asphalt with a two-inch overlay of asphalt cement, are included.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The article describes the challenges faced by a Colorado company when it overlayed a 25.5 mile stretch of Highway 149 south of Gunnison, Colorado, in the Rocky Mountains. The winding, two lane highway, complete with blind corners, was kept open for traffic during paving by using a pilot car to lead traffic from one end of construction to the other. The high elevation caused difficulties because of afternoon rainstorms and cool morning temperatures. Paving could only take place when it was dry and above 40 degrees. Details of the construction project, which included a one-inch leveling course of asphalt with a two-inch overlay of asphalt cement, are included.

Key concepts: Asphalt, Elevation (ballistics), Engineering, Mile, Environmental science, Civil engineering, Forensic engineering, Geology