GERMAN THREE-PHASE TRACTION DEVELOPMENT
Werner G. Teich
Abstract
Werner G. Teich
Abstract
The DB has commissioned Brown Boveri & Cie, Mannheim, to develop a high-power general-purpose electric locomotive with the aim to order five prototypes suitable for 160 km/h for service by 1978.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The DB has commissioned Brown Boveri & Cie, Mannheim, to develop a high-power general-purpose electric locomotive with the aim to order five prototypes suitable for 160 km/h for service by 1978.
Key concepts: German, Traction (geology), Engineering, Electrical engineering, Mechanical engineering, Geography, Archaeology