1975Unpublished venueRequires access

HIGHWAY TUNNELS - CONSTRUCTION - EQUIPMENT - OPERATION - COSTS

F Ramel, Joan Pera

Open publisher page 0 citations

Abstract

THE AUTHORS RECALL THAT THE CONSTRUCTION OF HIGHWAY TUNNELS MUST FOLLOW A DETAILED PRELIMINARY STUDY OF THE NECESSARY TRANSVERSE SECTION AND OF POSSIBLE CONSTRUCTION METHODS, TAKING INTO ACCOUNT THE SITE AND THE GEOTECHNICAL CHARACTERISTICS OF THE TERRAIN THROUGH WHICH THE STRUCTURE IS BUILT. NEW TECHNOLOGICAL DEVELOPMENTS AND IMPROVEMENTS IN THE MECHANIZATION OF DRILLING OPERATIONS HAVE TAKEN PLACE DURING THE LAST 15 YEARS (EXPLOSIVES - DRILLING MACHINES - PRESPLITTING, ETC). A CAREFUL STUDY MUST BE CONDUCTED OF THE EQUIPMENT NECESSARY FOR THE VENTILATION, LIGHTING, TRAFFIC SIGNS AND SIGNALS, COMMUNICATION. EXAMPLES OF CONSTRUCTIONAL AND OPERATIONAL COSTS ARE GIVEN. SEE ALSO IRRD ABSTRACT NO. 103758.

About this research paper

What this paper is about

THE AUTHORS RECALL THAT THE CONSTRUCTION OF HIGHWAY TUNNELS MUST FOLLOW A DETAILED PRELIMINARY STUDY OF THE NECESSARY TRANSVERSE SECTION AND OF POSSIBLE CONSTRUCTION METHODS, TAKING INTO ACCOUNT THE SITE AND THE GEOTECHNICAL CHARACTERISTICS OF THE TERRAIN THROUGH WHICH THE STRUCTURE IS BUILT. NEW TECHNOLOGICAL DEVELOPMENTS AND IMPROVEMENTS IN THE MECHANIZATION OF DRILLING OPERATIONS HAVE TAKEN PLACE DURING THE LAST 15 YEARS (EXPLOSIVES - DRILLING MACHINES - PRESPLITTING, ETC). A CAREFUL STUDY MUST BE CONDUCTED OF THE EQUIPMENT NECESSARY FOR THE VENTILATION, LIGHTING, TRAFFIC SIGNS AND SIGNALS, COMMUNICATION. EXAMPLES OF CONSTRUCTIONAL AND OPERATIONAL COSTS ARE GIVEN. SEE ALSO IRRD ABSTRACT NO. 103758.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE AUTHORS RECALL THAT THE CONSTRUCTION OF HIGHWAY TUNNELS MUST FOLLOW A DETAILED PRELIMINARY STUDY OF THE NECESSARY TRANSVERSE SECTION AND OF POSSIBLE CONSTRUCTION METHODS, TAKING INTO ACCOUNT THE SITE AND THE GEOTECHNICAL CHARACTERISTICS OF THE TERRAIN THROUGH WHICH THE STRUCTURE IS BUILT. NEW TECHNOLOGICAL DEVELOPMENTS AND IMPROVEMENTS IN THE MECHANIZATION OF DRILLING OPERATIONS HAVE TAKEN PLACE DURING THE LAST 15 YEARS (EXPLOSIVES - DRILLING MACHINES - PRESPLITTING, ETC). A CAREFUL STUDY MUST BE CONDUCTED OF THE EQUIPMENT NECESSARY FOR THE VENTILATION, LIGHTING, TRAFFIC SIGNS AND SIGNALS, COMMUNICATION. EXAMPLES OF CONSTRUCTIONAL AND OPERATIONAL COSTS ARE GIVEN. SEE ALSO IRRD ABSTRACT NO. 103758.

Key concepts: Engineering, Terrain, Construction engineering, Civil engineering, Drilling, Transport engineering, Forensic engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
HIGHWAY TUNNELS - CONSTRUCTION - EQUIPMENT - OPERATION - COSTS — Research Paper | ScholarLens