1975Planning & Transport Res & Comp, Sum Ann Mtg, ProcRequires access

EXPERIENCES WITH BRITISH HIGHWAY DESIGN PROGRAM IN DEVELOPING COUNTRIES

Malcolm Harris, L Pancino

Open publisher page 0 citations

Abstract

Two sets of programs, the BIPS (to translate the design effort from the drawing board to the ground) 1 and 2, and the HOPS (to minimise the constructional costs of such roads) are described and the suitability or otherwise of these programs is reported. BIPS 1 and 2 offer programs related to horizontal and vertical alignment, ground information, superelevation, road cross-section, full cross-section, and earthwork quantities. The horizontal and vertical alignment programs are flexible, easy to use, and present results in a very readable and acceptable manner. However, other programs require simplifications and modifications. With regard to the HOPS suite of programs, only the PRELUDE (ground simplification program) and the MINERVA (the optimising program) are discussed. Aspects of the programs that have presented problems are discussed.

About this research paper

What this paper is about

Two sets of programs, the BIPS (to translate the design effort from the drawing board to the ground) 1 and 2, and the HOPS (to minimise the constructional costs of such roads) are described and the suitability or otherwise of these programs is reported. BIPS 1 and 2 offer programs related to horizontal and vertical alignment, ground information, superelevation, road cross-section, full cross-section, and earthwork quantities. The horizontal and vertical alignment programs are flexible, easy to use, and present results in a very readable and acceptable manner. However, other programs require simplifications and modifications. With regard to the HOPS suite of programs, only the PRELUDE (ground simplification program) and the MINERVA (the optimising program) are discussed. Aspects of the programs that have presented problems are discussed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Two sets of programs, the BIPS (to translate the design effort from the drawing board to the ground) 1 and 2, and the HOPS (to minimise the constructional costs of such roads) are described and the suitability or otherwise of these programs is reported. BIPS 1 and 2 offer programs related to horizontal and vertical alignment, ground information, superelevation, road cross-section, full cross-section, and earthwork quantities. The horizontal and vertical alignment programs are flexible, easy to use, and present results in a very readable and acceptable manner. However, other programs require simplifications and modifications. With regard to the HOPS suite of programs, only the PRELUDE (ground simplification program) and the MINERVA (the optimising program) are discussed. Aspects of the programs that have presented problems are discussed.

Key concepts: Earthworks, Suite, Section (typography), Horizontal and vertical, Computer science, Transport engineering, Civil engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
EXPERIENCES WITH BRITISH HIGHWAY DESIGN PROGRAM IN DEVELOPING COUNTRIES — Research Paper | ScholarLens