Bridge (East) Street rail underbridge replacement for the Albury Wodonga Hume Freeway Project

John M. Steele, G Sisk, Andrew Deck

Open publisher page 0 citations

Abstract

The Bridge Street Rail underbridge on the Great Southern Rail line in South Albury had to be replaced as part of the upgrade of local roads to link in with the Albury Wodonga Hume Freeway Project. The railway and road had to remain fully operational throughout the construction with only two short track possessions available to install the major bridge components. This possession regime led to a number of innovative construction solutions to install the bridge. (a) For the covering entry of this conference, please see IRRD abstract no. E218160.

About this research paper

What this paper is about

The Bridge Street Rail underbridge on the Great Southern Rail line in South Albury had to be replaced as part of the upgrade of local roads to link in with the Albury Wodonga Hume Freeway Project. The railway and road had to remain fully operational throughout the construction with only two short track possessions available to install the major bridge components. This possession regime led to a number of innovative construction solutions to install the bridge. (a) For the covering entry of this conference, please see IRRD abstract no. E218160.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Bridge Street Rail underbridge on the Great Southern Rail line in South Albury had to be replaced as part of the upgrade of local roads to link in with the Albury Wodonga Hume Freeway Project. The railway and road had to remain fully operational throughout the construction with only two short track possessions available to install the major bridge components. This possession regime led to a number of innovative construction solutions to install the bridge. (a) For the covering entry of this conference, please see IRRD abstract no. E218160.

Key concepts: Bridge (graph theory), Upgrade, Transport engineering, Track (disk drive), Light rail, Possession (linguistics), Engineering, Railway line