Design and construction of twin track Dudley Street bridge
Matt Buttigieg, Kabir Patoary
Abstract
Matt Buttigieg, Kabir Patoary
Abstract
The new Dudley Street Bridge is a 74m long structure supporting the Up and Down Regional Rail Link tracks to provide access to Platforms 1 to 8 at Southern Cross Station. The bridge is part of the $3.65 billion Regional Rail Link project in Victoria, section being delivered by the City to Maribyrnong River Alliance (Regional Rail Link Authority, V/Line, Metro Trains Melbourne, John Holland, Lend Lease, Coleman Rail, AECOM and GHD).
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The new Dudley Street Bridge is a 74m long structure supporting the Up and Down Regional Rail Link tracks to provide access to Platforms 1 to 8 at Southern Cross Station. The bridge is part of the $3.65 billion Regional Rail Link project in Victoria, section being delivered by the City to Maribyrnong River Alliance (Regional Rail Link Authority, V/Line, Metro Trains Melbourne, John Holland, Lend Lease, Coleman Rail, AECOM and GHD).
Key concepts: Bridge (graph theory), Track (disk drive), Lease, Train, Transport engineering, Section (typography), Engineering, Alliance