ABCs of Prefab Bridge Elements

Anthony Rotondo, Philip Creamer

Open publisher page 0 citations

Abstract

This article discusses the Federal Highway Administration’s Accelerated Bridge Construction (ABC) program. The ABC program emphasizes the use of innovative planning, design, materials and construction methods to reduce onsite construction time. One ABC strategy is to use prefabricated bridge elements and systems (PBES), which can reduce costs, construction time, environmental impacts, and traffic delays. A case study of a bridge replacement project in Rhode Island is highlighted to demonstrate the benefits of ABC.

About this research paper

What this paper is about

This article discusses the Federal Highway Administration’s Accelerated Bridge Construction (ABC) program. The ABC program emphasizes the use of innovative planning, design, materials and construction methods to reduce onsite construction time. One ABC strategy is to use prefabricated bridge elements and systems (PBES), which can reduce costs, construction time, environmental impacts, and traffic delays. A case study of a bridge replacement project in Rhode Island is highlighted to demonstrate the benefits of ABC.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article discusses the Federal Highway Administration’s Accelerated Bridge Construction (ABC) program. The ABC program emphasizes the use of innovative planning, design, materials and construction methods to reduce onsite construction time. One ABC strategy is to use prefabricated bridge elements and systems (PBES), which can reduce costs, construction time, environmental impacts, and traffic delays. A case study of a bridge replacement project in Rhode Island is highlighted to demonstrate the benefits of ABC.

Key concepts: Bridge (graph theory), Transport engineering, Construction engineering, Computer science, Engineering, Civil engineering, Medicine, Internal medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
ABCs of Prefab Bridge Elements — Research Paper | ScholarLens