ABCs of Prefab Bridge Elements
Anthony Rotondo, Philip Creamer
Abstract
Anthony Rotondo, Philip Creamer
Abstract
This article discusses the Federal Highway Administration’s Accelerated Bridge Construction (ABC) program. The ABC program emphasizes the use of innovative planning, design, materials and construction methods to reduce onsite construction time. One ABC strategy is to use prefabricated bridge elements and systems (PBES), which can reduce costs, construction time, environmental impacts, and traffic delays. A case study of a bridge replacement project in Rhode Island is highlighted to demonstrate the benefits of ABC.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article discusses the Federal Highway Administration’s Accelerated Bridge Construction (ABC) program. The ABC program emphasizes the use of innovative planning, design, materials and construction methods to reduce onsite construction time. One ABC strategy is to use prefabricated bridge elements and systems (PBES), which can reduce costs, construction time, environmental impacts, and traffic delays. A case study of a bridge replacement project in Rhode Island is highlighted to demonstrate the benefits of ABC.
Key concepts: Bridge (graph theory), Transport engineering, Construction engineering, Computer science, Engineering, Civil engineering, Medicine, Internal medicine