2000Unpublished venueRequires access

DIFFERENT UTILISATION OF THE RAILWAY NETWORK: FLEXIBLE TIME/ROUTE WINDOWS

Aam Schaafsma

Open publisher page 0 citations

Abstract

The discussion on better utilisation of the railway infrastructure is often limited to the introduction of new interlocking and control systems and, more recently, the homogenisation of the timetable. An innovation with a greater impact is the different utilisation concept, which is featured by a more dynamic use of the infrastructure. A transportation plan and a traffic plan take over the functions of the timetable. Flexible time/route windows in the traffic plan replace the time/route lines of the timetable, which creates explicit freedom of control for a dynamic traffic control system. The concept yields benefits in terms of: flexibility (it is easier to execute last minute changes); reliability/punctuality (trains do not have to wait for each other without reason); and in terms of cost reduction (it is possible to circumvent bottlenecks in the infrastructure capacity at expensive locations). (A) For the covering abstract of the conference see ITRD E206312.

About this research paper

What this paper is about

The discussion on better utilisation of the railway infrastructure is often limited to the introduction of new interlocking and control systems and, more recently, the homogenisation of the timetable. An innovation with a greater impact is the different utilisation concept, which is featured by a more dynamic use of the infrastructure. A transportation plan and a traffic plan take over the functions of the timetable. Flexible time/route windows in the traffic plan replace the time/route lines of the timetable, which creates explicit freedom of control for a dynamic traffic control system. The concept yields benefits in terms of: flexibility (it is easier to execute last minute changes); reliability/punctuality (trains do not have to wait for each other without reason); and in terms of cost reduction (it is possible to circumvent bottlenecks in the infrastructure capacity at expensive locations). (A) For the covering abstract of the conference see ITRD E206312.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The discussion on better utilisation of the railway infrastructure is often limited to the introduction of new interlocking and control systems and, more recently, the homogenisation of the timetable. An innovation with a greater impact is the different utilisation concept, which is featured by a more dynamic use of the infrastructure. A transportation plan and a traffic plan take over the functions of the timetable. Flexible time/route windows in the traffic plan replace the time/route lines of the timetable, which creates explicit freedom of control for a dynamic traffic control system. The concept yields benefits in terms of: flexibility (it is easier to execute last minute changes); reliability/punctuality (trains do not have to wait for each other without reason); and in terms of cost reduction (it is possible to circumvent bottlenecks in the infrastructure capacity at expensive locations). (A) For the covering abstract of the conference see ITRD E206312.

Key concepts: Punctuality, Train, Flexibility (engineering), Plan (archaeology), Transport engineering, Control (management), Reliability (semiconductor), Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
DIFFERENT UTILISATION OF THE RAILWAY NETWORK: FLEXIBLE TIME/ROUTE WINDOWS — Research Paper | ScholarLens