OUTLINING THE TIMETABLE OF A RAILWAY SYSTEM ACCORDING TO ITS CAPACITY COMPUTATION

L. Florio, Lorenzo Mussone

Open publisher page 1 citations

Abstract

This paper deals with the outlining of a timetable for a railway line in order to maximize its potential capacity. The application studied is the line Bern-Thun of the Swiss Federal Railways, characterized by heavy heterogeneous traffic. Long and complex computer-aided calculations on the capacity of stretches and stations on the line indicate that there are further utilization margins; hence, the need to reset the timetable to maximize the utilization of the line capacity. This implied the complete repositioning of trains on station tracks and a relevant change in managing the railway station plan of the city of Bern. Results thus obtained can be generalized: an 'optimal' timetable--that can combine the maximum transport capacity and the user's demands--exists for any railway line.

About this research paper

What this paper is about

This paper deals with the outlining of a timetable for a railway line in order to maximize its potential capacity. The application studied is the line Bern-Thun of the Swiss Federal Railways, characterized by heavy heterogeneous traffic. Long and complex computer-aided calculations on the capacity of stretches and stations on the line indicate that there are further utilization margins; hence, the need to reset the timetable to maximize the utilization of the line capacity. This implied the complete repositioning of trains on station tracks and a relevant change in managing the railway station plan of the city of Bern. Results thus obtained can be generalized: an 'optimal' timetable--that can combine the maximum transport capacity and the user's demands--exists for any railway line.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper deals with the outlining of a timetable for a railway line in order to maximize its potential capacity. The application studied is the line Bern-Thun of the Swiss Federal Railways, characterized by heavy heterogeneous traffic. Long and complex computer-aided calculations on the capacity of stretches and stations on the line indicate that there are further utilization margins; hence, the need to reset the timetable to maximize the utilization of the line capacity. This implied the complete repositioning of trains on station tracks and a relevant change in managing the railway station plan of the city of Bern. Results thus obtained can be generalized: an 'optimal' timetable--that can combine the maximum transport capacity and the user's demands--exists for any railway line.

Key concepts: Train, Line (geometry), Reset (finance), Plan (archaeology), Transport engineering, Capacity planning, Computer science, Operations research

Related papers

Back to paper searchBrowse research topicsOriginal source
OUTLINING THE TIMETABLE OF A RAILWAY SYSTEM ACCORDING TO ITS CAPACITY COMPUTATION — Research Paper | ScholarLens