Epping to Chatswood - the final touches

J Rozek

Open publisher page 0 citations

Abstract

This article describes how tunnel boring machines (TBMs) are being used to construct a new, 12.5-kilometer rail line between Chatswood, a business center near Sydney, Australia, and the outlying suburb of Epping. The $679 million project includes twin running tunnels and four underground stations. The article describes in detail how the refurbished 7.2-meter TBMs were used to excavate the tunnels, what type of rock was bored, the design of the tunnel support system, and the sequencing of the work. It also describes the permanent lining of the running tunnels, a circular-formed, un-reinforced concrete, and water control. A number of innovative solutions were devised for the project, which is scheduled to be completed in 2008.

About this research paper

What this paper is about

This article describes how tunnel boring machines (TBMs) are being used to construct a new, 12.5-kilometer rail line between Chatswood, a business center near Sydney, Australia, and the outlying suburb of Epping. The $679 million project includes twin running tunnels and four underground stations. The article describes in detail how the refurbished 7.2-meter TBMs were used to excavate the tunnels, what type of rock was bored, the design of the tunnel support system, and the sequencing of the work. It also describes the permanent lining of the running tunnels, a circular-formed, un-reinforced concrete, and water control. A number of innovative solutions were devised for the project, which is scheduled to be completed in 2008.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article describes how tunnel boring machines (TBMs) are being used to construct a new, 12.5-kilometer rail line between Chatswood, a business center near Sydney, Australia, and the outlying suburb of Epping. The $679 million project includes twin running tunnels and four underground stations. The article describes in detail how the refurbished 7.2-meter TBMs were used to excavate the tunnels, what type of rock was bored, the design of the tunnel support system, and the sequencing of the work. It also describes the permanent lining of the running tunnels, a circular-formed, un-reinforced concrete, and water control. A number of innovative solutions were devised for the project, which is scheduled to be completed in 2008.

Key concepts: Engineering, Civil engineering, Work (physics), Construct (python library), Line (geometry), Forensic engineering, Mechanical engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Epping to Chatswood - the final touches — Research Paper | ScholarLens