Tunnel Treasure Peak Tunnel in the Existing Railway Tunnel Construction Technology

Pingxiang Zhang

Open publisher page 0 citations

Abstract

Baofeng Tunnel total length is 7377m,it is the one of the key part between Kunyang and Yuxi of the railway which is from Kunming to Hekou.The exit zone(D2K17+615) is under-passing the Kunyu Railway,its tunnel front is 50m far from the railway and 27m high from subgrade of that.It is difficult to build up a tunnel under-pass an existing railway without affecting its normal operation.For ensuring both line safety and traffic safety and achieving the success of this tunnel construction,some key points the author points out as follow.Firstly,doing reinforcement in advanced.Secondly,have a reasonable construction technique during the whole construction.Thirdly,strengthen primary support.Finally,control the settlement strictly.

About this research paper

What this paper is about

Baofeng Tunnel total length is 7377m,it is the one of the key part between Kunyang and Yuxi of the railway which is from Kunming to Hekou.The exit zone(D2K17+615) is under-passing the Kunyu Railway,its tunnel front is 50m far from the railway and 27m high from subgrade of that.It is difficult to build up a tunnel under-pass an existing railway without affecting its normal operation.For ensuring both line safety and traffic safety and achieving the success of this tunnel construction,some key points the author points out as follow.Firstly,doing reinforcement in advanced.Secondly,have a reasonable construction technique during the whole construction.Thirdly,strengthen primary support.Finally,control the settlement strictly.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Baofeng Tunnel total length is 7377m,it is the one of the key part between Kunyang and Yuxi of the railway which is from Kunming to Hekou.The exit zone(D2K17+615) is under-passing the Kunyu Railway,its tunnel front is 50m far from the railway and 27m high from subgrade of that.It is difficult to build up a tunnel under-pass an existing railway without affecting its normal operation.For ensuring both line safety and traffic safety and achieving the success of this tunnel construction,some key points the author points out as follow.Firstly,doing reinforcement in advanced.Secondly,have a reasonable construction technique during the whole construction.Thirdly,strengthen primary support.Finally,control the settlement strictly.

Key concepts: Subgrade, Railway tunnel, Engineering, Railway line, Settlement (finance), Tunnel construction, Key (lock), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Tunnel Treasure Peak Tunnel in the Existing Railway Tunnel Construction Technology — Research Paper | ScholarLens