THE ARLES-FOS INTERURBAN MOTORWAY WILL LINK THE INDUSTRIAL ZONE AND HARBOUR OF FOS AND THE LANGUEDOC REGION, AND THE RHONE VALLEY; IT WILL COMPRISE TWO SECTIONS: THE FIRST, 14,4 KM LONG, BETWEEN ARLES AND SAINT-HIPPOLYTE, WILL BE THE LOCAL DIVERSION OF THE RN113. THIS SECTION COULD BE INTEGRATED IN THE INTERURBAN EAST-WEST MOTORWAY LINKING THE LANGUEDOC MOTORWAY 19 TO THE PROVENCAL, THE A8 MOTORWAY. THE SECOND SECTION, 19,7 KM LONG, CONSISTS OF A ROAD PARALLEL TO THE RN568 BETWEEN SAINT-HIPPOLYTE AND FOS. THE CONSTRUCTION OPERATIONS WERE COMPLETED IN 20 MONTHS. THE COST WAS 55 MILLION FRANCS FOR THE ARLES-SAINT-HIPPOLYTE SECTION, THAT IS TO SAY 4,4 MF/KM AND 33 MILLION FRANCS FOR THE SAINT-HIPPOLYTE-FOS SECTION, THAT IS TO SAY 1,67 MF/KM. SPECIAL DETAILS ARE GIVEN OF THE EARTHWORKS AT A SITE WHERE COMPRESSIBLE SOIL WAS FOUND TOGETHER WITH THE FOUNDATIONS OF ENGINEERING STRUCTURES IN THE SAME ZONE. SILICO-LIMESTONE AGGREGATES WERE USED IN THE CARRIAGEWAY. MENTION IS MADE OF THE THICKNESS OF GRAVEL-BITUMEN LAYERS. CONTINUOUS CONTROLS WERE CARRIED OUT: 1340 MEASUREMENTS OF THE DENSITY, 1340 MEASUREMENTS OF THE THICKNESSES, 2640 DEFLECTION MEASUREMENTS, AND 8022 MEASUREMENTS OF THE BINDER CONTENT.

About this research paper

What this paper is about

THE ARLES-FOS INTERURBAN MOTORWAY WILL LINK THE INDUSTRIAL ZONE AND HARBOUR OF FOS AND THE LANGUEDOC REGION, AND THE RHONE VALLEY; IT WILL COMPRISE TWO SECTIONS: THE FIRST, 14,4 KM LONG, BETWEEN ARLES AND SAINT-HIPPOLYTE, WILL BE THE LOCAL DIVERSION OF THE RN113. THIS SECTION COULD BE INTEGRATED IN THE INTERURBAN EAST-WEST MOTORWAY LINKING THE LANGUEDOC MOTORWAY 19 TO THE PROVENCAL, THE A8 MOTORWAY. THE SECOND SECTION, 19,7 KM LONG, CONSISTS OF A ROAD PARALLEL TO THE RN568 BETWEEN SAINT-HIPPOLYTE AND FOS. THE CONSTRUCTION OPERATIONS WERE COMPLETED IN 20 MONTHS. THE COST WAS 55 MILLION FRANCS FOR THE ARLES-SAINT-HIPPOLYTE SECTION, THAT IS TO SAY 4,4 MF/KM AND 33 MILLION FRANCS FOR THE SAINT-HIPPOLYTE-FOS SECTION, THAT IS TO SAY 1,67 MF/KM. SPECIAL DETAILS ARE GIVEN OF THE EARTHWORKS AT A SITE WHERE COMPRESSIBLE SOIL WAS FOUND TOGETHER WITH THE FOUNDATIONS OF ENGINEERING STRUCTURES IN THE SAME ZONE. SILICO-LIMESTONE AGGREGATES WERE USED IN THE CARRIAGEWAY. MENTION IS MADE OF THE THICKNESS OF GRAVEL-BITUMEN LAYERS. CONTINUOUS CONTROLS WERE CARRIED OUT: 1340 MEASUREMENTS OF THE DENSITY, 1340 MEASUREMENTS OF THE THICKNESSES, 2640 DEFLECTION MEASUREMENTS, AND 8022 MEASUREMENTS OF THE BINDER CONTENT.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE ARLES-FOS INTERURBAN MOTORWAY WILL LINK THE INDUSTRIAL ZONE AND HARBOUR OF FOS AND THE LANGUEDOC REGION, AND THE RHONE VALLEY; IT WILL COMPRISE TWO SECTIONS: THE FIRST, 14,4 KM LONG, BETWEEN ARLES AND SAINT-HIPPOLYTE, WILL BE THE LOCAL DIVERSION OF THE RN113. THIS SECTION COULD BE INTEGRATED IN THE INTERURBAN EAST-WEST MOTORWAY LINKING THE LANGUEDOC MOTORWAY 19 TO THE PROVENCAL, THE A8 MOTORWAY. THE SECOND SECTION, 19,7 KM LONG, CONSISTS OF A ROAD PARALLEL TO THE RN568 BETWEEN SAINT-HIPPOLYTE AND FOS. THE CONSTRUCTION OPERATIONS WERE COMPLETED IN 20 MONTHS. THE COST WAS 55 MILLION FRANCS FOR THE ARLES-SAINT-HIPPOLYTE SECTION, THAT IS TO SAY 4,4 MF/KM AND 33 MILLION FRANCS FOR THE SAINT-HIPPOLYTE-FOS SECTION, THAT IS TO SAY 1,67 MF/KM. SPECIAL DETAILS ARE GIVEN OF THE EARTHWORKS AT A SITE WHERE COMPRESSIBLE SOIL WAS FOUND TOGETHER WITH THE FOUNDATIONS OF ENGINEERING STRUCTURES IN THE SAME ZONE. SILICO-LIMESTONE AGGREGATES WERE USED IN THE CARRIAGEWAY. MENTION IS MADE OF THE THICKNESS OF GRAVEL-BITUMEN LAYERS. CONTINUOUS CONTROLS WERE CARRIED OUT: 1340 MEASUREMENTS OF THE DENSITY, 1340 MEASUREMENTS OF THE THICKNESSES, 2640 DEFLECTION MEASUREMENTS, AND 8022 MEASUREMENTS OF THE BINDER CONTENT.

Key concepts: Geology, Earthworks, Interurban, Section (typography), SAINT, Archaeology, Mining engineering, Geography