1974Unpublished venueRequires access

THE SOUTHERN URBAN MOTORWAY IN NICE

A Liautaud

Open publisher page 0 citations

Abstract

BRIEF DETAILS ARE GIVEN OF THE MOTORWAY ALIGNMENT WHICH GOES TO THE CENTRE OF THE CITY AND WHICH COST APPROXIMATELY 600 MILLION FRANCS, 40% OF WHICH BEING COMPENSATION FOR EXPROPRIATION. THE SAINT PHILIPPE-CAMBETTA SECTION IS BUILT OVER A PRESTRESSED VIADUCT. THE DESIGN SPEED ADOPTED FOR THE ALIGNMENT AND LONGITUDINAL PROFILE WAS 80 KM/H. THE GAMBETTA-CIMIEZ SECTION IS DIVIDED INTO TWO PARTS: (1) THE GAMBETTA-MALAUSSENA PART ALSO BUILT ON A PRESTRESSED VIADUCT WITH INDEPENDENT SPANS MADE OF PRECAST GIRDERS RESTING ON TRANSVERSE FRAMES WHICH ARE SUPPORTED BY BARS SUNK IN THE SOIL; (2) THE MALAUSSENA-CIMIEZ PART SIMILAR TO THE PREVIOUS PART EXCEPT THAT THE BEARINGS OF THE FRAME INSTEAD OF BEING LOCATED BETWEEN THE RAILWAY TRACKS ARE ON EACH SIDE OF THE RAILWAY PLATFORM.

About this research paper

What this paper is about

BRIEF DETAILS ARE GIVEN OF THE MOTORWAY ALIGNMENT WHICH GOES TO THE CENTRE OF THE CITY AND WHICH COST APPROXIMATELY 600 MILLION FRANCS, 40% OF WHICH BEING COMPENSATION FOR EXPROPRIATION. THE SAINT PHILIPPE-CAMBETTA SECTION IS BUILT OVER A PRESTRESSED VIADUCT. THE DESIGN SPEED ADOPTED FOR THE ALIGNMENT AND LONGITUDINAL PROFILE WAS 80 KM/H. THE GAMBETTA-CIMIEZ SECTION IS DIVIDED INTO TWO PARTS: (1) THE GAMBETTA-MALAUSSENA PART ALSO BUILT ON A PRESTRESSED VIADUCT WITH INDEPENDENT SPANS MADE OF PRECAST GIRDERS RESTING ON TRANSVERSE FRAMES WHICH ARE SUPPORTED BY BARS SUNK IN THE SOIL; (2) THE MALAUSSENA-CIMIEZ PART SIMILAR TO THE PREVIOUS PART EXCEPT THAT THE BEARINGS OF THE FRAME INSTEAD OF BEING LOCATED BETWEEN THE RAILWAY TRACKS ARE ON EACH SIDE OF THE RAILWAY PLATFORM.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

BRIEF DETAILS ARE GIVEN OF THE MOTORWAY ALIGNMENT WHICH GOES TO THE CENTRE OF THE CITY AND WHICH COST APPROXIMATELY 600 MILLION FRANCS, 40% OF WHICH BEING COMPENSATION FOR EXPROPRIATION. THE SAINT PHILIPPE-CAMBETTA SECTION IS BUILT OVER A PRESTRESSED VIADUCT. THE DESIGN SPEED ADOPTED FOR THE ALIGNMENT AND LONGITUDINAL PROFILE WAS 80 KM/H. THE GAMBETTA-CIMIEZ SECTION IS DIVIDED INTO TWO PARTS: (1) THE GAMBETTA-MALAUSSENA PART ALSO BUILT ON A PRESTRESSED VIADUCT WITH INDEPENDENT SPANS MADE OF PRECAST GIRDERS RESTING ON TRANSVERSE FRAMES WHICH ARE SUPPORTED BY BARS SUNK IN THE SOIL; (2) THE MALAUSSENA-CIMIEZ PART SIMILAR TO THE PREVIOUS PART EXCEPT THAT THE BEARINGS OF THE FRAME INSTEAD OF BEING LOCATED BETWEEN THE RAILWAY TRACKS ARE ON EACH SIDE OF THE RAILWAY PLATFORM.

Key concepts: Precast concrete, Girder, Engineering, Prestressed concrete, Structural engineering, Expropriation, Section (typography), Span (engineering)

Related papers

Back to paper searchBrowse research topicsOriginal source
THE SOUTHERN URBAN MOTORWAY IN NICE — Research Paper | ScholarLens