Importance of data and related uncertainties in probabilistic risk assessments. [PWR; BWR]

Timothy A. Wheeler, Robert G. Spulak

Open publisher page 0 citations

Abstract

In a probabilistic risk assessment (PRA), estimates of the probabilities of occurrence of a wide variety of basic events, such as equipment failures and human errors, are combined to provide estimates of other parameters of interest such as core-melt frequency. Identification of important basic events in a PRA can help identify weak spots in the power plant and lead to possible improvements. Thus, to this end, a variety of importance measures have been proposed and used to help interpret PRAs. These measures are described here and the results of applying these measures to PRAs of the Millstone(3) and GrandGulf(4) plants (two boiling water reactors, BWRs) are presented. The Grand Gulf Reactor Safety Study methodology Applications Program (RSSMAP) and Millstone Interim Reliability Evaluation Program (IREP) PRAs were selected due to the quality of the core-melt frequency equations presented in the PRAs and because the plant chosen for the RMIEP PRA, La Salle, is a BWR. The results from this analysis will help guide data collection efforts for the LaSalle PRA.

About this research paper

What this paper is about

In a probabilistic risk assessment (PRA), estimates of the probabilities of occurrence of a wide variety of basic events, such as equipment failures and human errors, are combined to provide estimates of other parameters of interest such as core-melt frequency. Identification of important basic events in a PRA can help identify weak spots in the power plant and lead to possible improvements. Thus, to this end, a variety of importance measures have been proposed and used to help interpret PRAs. These measures are described here and the results of applying these measures to PRAs of the Millstone(3) and GrandGulf(4) plants (two boiling water reactors, BWRs) are presented. The Grand Gulf Reactor Safety Study methodology Applications Program (RSSMAP) and Millstone Interim Reliability Evaluation Program (IREP) PRAs were selected due to the quality of the core-melt frequency equations presented in the PRAs and because the plant chosen for the RMIEP PRA, La Salle, is a BWR. The results from this analysis will help guide data collection efforts for the LaSalle PRA.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In a probabilistic risk assessment (PRA), estimates of the probabilities of occurrence of a wide variety of basic events, such as equipment failures and human errors, are combined to provide estimates of other parameters of interest such as core-melt frequency. Identification of important basic events in a PRA can help identify weak spots in the power plant and lead to possible improvements. Thus, to this end, a variety of importance measures have been proposed and used to help interpret PRAs. These measures are described here and the results of applying these measures to PRAs of the Millstone(3) and GrandGulf(4) plants (two boiling water reactors, BWRs) are presented. The Grand Gulf Reactor Safety Study methodology Applications Program (RSSMAP) and Millstone Interim Reliability Evaluation Program (IREP) PRAs were selected due to the quality of the core-melt frequency equations presented in the PRAs and because the plant chosen for the RMIEP PRA, La Salle, is a BWR. The results from this analysis will help guide data collection efforts for the LaSalle PRA.

Key concepts: Boiling water reactor, Interim, Probabilistic logic, Probabilistic risk assessment, Engineering, Reliability (semiconductor), Nuclear engineering, Forensic engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Importance of data and related uncertainties in probabilistic risk assessments. [PWR; BWR] — Research Paper | ScholarLens