Progress of J-PARC LINAC Commissioning

Yong Liu, Zhigao FANG, K. Futatsukawa, T. Ito, Akihiko Miura, Tomoaki Miyao, Takatoshi Morishita, Katsuhiro Moriya, Kota Okabe, M. Otani, T. Shibata, Jun Tamura

Open full text 6 citations

Abstract

After energy and intensity upgrade to 400MeV and 50mA respectively, J-PARC linac were ready for 1 MW beam power from RCS. J-PARC is now successfully operated at 50mA/400MeV for 500kW at neutron target, and on the way to 1MW. The next milestones 1.2 and 1.5MW from RCS are relying on feasibility and property of increase of peak current to 60 mA and the pulse width to 600us in linac. Beam studies were carried out at linac to study the initial beam parameters from ion source/RFQ, to find the optimized lattice and matching, to clarify beam loss source and to mitigate the loss/residue dose for the power upgrade.

About this research paper

What this paper is about

After energy and intensity upgrade to 400MeV and 50mA respectively, J-PARC linac were ready for 1 MW beam power from RCS. J-PARC is now successfully operated at 50mA/400MeV for 500kW at neutron target, and on the way to 1MW. The next milestones 1.2 and 1.5MW from RCS are relying on feasibility and property of increase of peak current to 60 mA and the pulse width to 600us in linac. Beam studies were carried out at linac to study the initial beam parameters from ion source/RFQ, to find the optimized lattice and matching, to clarify beam loss source and to mitigate the loss/residue dose for the power upgrade.

Why it matters

OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

After energy and intensity upgrade to 400MeV and 50mA respectively, J-PARC linac were ready for 1 MW beam power from RCS. J-PARC is now successfully operated at 50mA/400MeV for 500kW at neutron target, and on the way to 1MW. The next milestones 1.2 and 1.5MW from RCS are relying on feasibility and property of increase of peak current to 60 mA and the pulse width to 600us in linac. Beam studies were carried out at linac to study the initial beam parameters from ion source/RFQ, to find the optimized lattice and matching, to clarify beam loss source and to mitigate the loss/residue dose for the power upgrade.

Key concepts: Project commissioning, Linear particle accelerator, Nuclear engineering, Computer science, Engineering, Political science, Physics, Publishing

Related papers

Back to paper searchBrowse research topicsOriginal source
Progress of J-PARC LINAC Commissioning — Research Paper | ScholarLens