The J-PARC linac has delivered beam to users since 2008. As of 2018, the linac provides a 40 mA beam at an energy of 400 MeV to the following Rapid Cycling Synchrotron. We have had many issues to impede high availability during the operation. One of them was troubles of high voltage power supply of klystrons. The other category is related to vacuum property in accelerating cavities. The vacuum pumps were reinforced at the RFQ#1 in 2009. The cleaning of the inside surface of some acceleration cavities were performed after the big earthquake in 2011. The cooling water flow rate drop had been a long-time issue. We modified a cooling system to take better flow balances. As a result of these improvement, the availability is approximately 92% or more in these days. However, we have encountered another issue due to some aging components. The operation experiences and availability improvement at the J-PARC linac will be presented.

About this research paper

What this paper is about

The J-PARC linac has delivered beam to users since 2008. As of 2018, the linac provides a 40 mA beam at an energy of 400 MeV to the following Rapid Cycling Synchrotron. We have had many issues to impede high availability during the operation. One of them was troubles of high voltage power supply of klystrons. The other category is related to vacuum property in accelerating cavities. The vacuum pumps were reinforced at the RFQ#1 in 2009. The cleaning of the inside surface of some acceleration cavities were performed after the big earthquake in 2011. The cooling water flow rate drop had been a long-time issue. We modified a cooling system to take better flow balances. As a result of these improvement, the availability is approximately 92% or more in these days. However, we have encountered another issue due to some aging components. The operation experiences and availability improvement at the J-PARC linac will be presented.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The J-PARC linac has delivered beam to users since 2008. As of 2018, the linac provides a 40 mA beam at an energy of 400 MeV to the following Rapid Cycling Synchrotron. We have had many issues to impede high availability during the operation. One of them was troubles of high voltage power supply of klystrons. The other category is related to vacuum property in accelerating cavities. The vacuum pumps were reinforced at the RFQ#1 in 2009. The cleaning of the inside surface of some acceleration cavities were performed after the big earthquake in 2011. The cooling water flow rate drop had been a long-time issue. We modified a cooling system to take better flow balances. As a result of these improvement, the availability is approximately 92% or more in these days. However, we have encountered another issue due to some aging components. The operation experiences and availability improvement at the J-PARC linac will be presented.

Key concepts: Linear particle accelerator, Physics, Optics, Beam (structure)