Recent Progress of the Beam Commissioning in J-PARC Linac

T. Maruta, K. Futatsukawa, Masanori Ikegami, Yong Liu, Akihiko Miura, Tomoaki Miyao

Open full text 1 citations

Abstract

J-PARC linac iis replaced the front-end in the summer shutdown in year 2014 to extend the maximum peak current to 50 mA from 30 mA. By the combination with the energy upgrade conducted in year 2013, it becomes possible to achieve the design beam energy of 133 kW, which is corresponding to 1 MW at the extraction of 3 GeV Rapid Cycling Sychrotron (RCS). The beam commissioning after the replacement started at Sep./27, and we can successfully accelerate the beam at peak current of 30 mA and 50 mA. In this presentation, we introduce the resent progress of the beam commissioning of the J-PARC linac.

About this research paper

What this paper is about

J-PARC linac iis replaced the front-end in the summer shutdown in year 2014 to extend the maximum peak current to 50 mA from 30 mA. By the combination with the energy upgrade conducted in year 2013, it becomes possible to achieve the design beam energy of 133 kW, which is corresponding to 1 MW at the extraction of 3 GeV Rapid Cycling Sychrotron (RCS). The beam commissioning after the replacement started at Sep./27, and we can successfully accelerate the beam at peak current of 30 mA and 50 mA. In this presentation, we introduce the resent progress of the beam commissioning of the J-PARC linac.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

J-PARC linac iis replaced the front-end in the summer shutdown in year 2014 to extend the maximum peak current to 50 mA from 30 mA. By the combination with the energy upgrade conducted in year 2013, it becomes possible to achieve the design beam energy of 133 kW, which is corresponding to 1 MW at the extraction of 3 GeV Rapid Cycling Sychrotron (RCS). The beam commissioning after the replacement started at Sep./27, and we can successfully accelerate the beam at peak current of 30 mA and 50 mA. In this presentation, we introduce the resent progress of the beam commissioning of the J-PARC linac.

Key concepts: Linear particle accelerator, Nuclear engineering, Beam (structure), Physics, Engineering, Optics

Related papers

Back to paper searchBrowse research topicsOriginal source
Recent Progress of the Beam Commissioning in J-PARC Linac — Research Paper | ScholarLens