Study on Ground Settlement of Tunnel Shield Construction Based on GRA

Shiyu Li, Zhang Yuhui, Tao Gang, Zhang Lijing

Open publisher page 1 citations

Abstract

In recent years, the accident statistics of shield tunneling in China's subway tunnels show that the collapse is the most frequent type of accident in subway construction projects. Once it occurs, it often results in group bodied injuries and major economic losses, and the social impact is serious. Due to the disturbance of the surrounding soil caused by the shield construction, uneven settlement on the ground and protective measures were not developed in time and then evolved into high-accident, high-caused collapse accidents. In addition to the engineering geological conditions in the shield construction, the tunneling speed, cutterhead torque, soil warehouses pressure, simultaneous grouting amount, simultaneous grouting pressure, and other parameters in the shield construction are also the main factors affecting ground settlement. This paper analyzes the grey connection degree between the settlement monitoring of a metro shield construction and the shield construction parameters in a certain city. It is concluded that the most important factor causing ground settlement is the pressure of the earth storage, and corresponding preventive measures are proposed for the subsequent tunnel shield construction. It is instructive to reduce surface subsidence and prevent it from becoming a collapse accident.

About this research paper

What this paper is about

In recent years, the accident statistics of shield tunneling in China's subway tunnels show that the collapse is the most frequent type of accident in subway construction projects. Once it occurs, it often results in group bodied injuries and major economic losses, and the social impact is serious. Due to the disturbance of the surrounding soil caused by the shield construction, uneven settlement on the ground and protective measures were not developed in time and then evolved into high-accident, high-caused collapse accidents. In addition to the engineering geological conditions in the shield construction, the tunneling speed, cutterhead torque, soil warehouses pressure, simultaneous grouting amount, simultaneous grouting pressure, and other parameters in the shield construction are also the main factors affecting ground settlement. This paper analyzes the grey connection degree between the settlement monitoring of a metro shield construction and the shield construction parameters in a certain city. It is concluded that the most important factor causing ground settlement is the pressure of the earth storage, and corresponding preventive measures are proposed for the subsequent tunnel shield construction. It is instructive to reduce surface subsidence and prevent it from becoming a collapse accident.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In recent years, the accident statistics of shield tunneling in China's subway tunnels show that the collapse is the most frequent type of accident in subway construction projects. Once it occurs, it often results in group bodied injuries and major economic losses, and the social impact is serious. Due to the disturbance of the surrounding soil caused by the shield construction, uneven settlement on the ground and protective measures were not developed in time and then evolved into high-accident, high-caused collapse accidents. In addition to the engineering geological conditions in the shield construction, the tunneling speed, cutterhead torque, soil warehouses pressure, simultaneous grouting amount, simultaneous grouting pressure, and other parameters in the shield construction are also the main factors affecting ground settlement. This paper analyzes the grey connection degree between the settlement monitoring of a metro shield construction and the shield construction parameters in a certain city. It is concluded that the most important factor causing ground settlement is the pressure of the earth storage, and corresponding preventive measures are proposed for the subsequent tunnel shield construction. It is instructive to reduce surface subsidence and prevent it from becoming a collapse accident.

Key concepts: Shield, Settlement (finance), Tunnel construction, Geotechnical engineering, Ground subsidence, Mining engineering, Subsidence, Inner mongolia

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Ground Settlement of Tunnel Shield Construction Based on GRA — Research Paper | ScholarLens