2019Applied SciencesOpen access

Stress Field Distribution and Deformation Law of Large Deformation Tunnel Excavation in Soft Rock Mass

Heng Zhang, Liang Chen, Yimo Zhu, Zelin Zhou, Shougen Chen

Open full text 47 citations

Abstract

The problem of large deformation is very prominent in deep-buried tunnel excavation in soft rock, which brings serious potential safety hazards and economic losses to projects. Knowledge of the stress field distribution and deformation law is the key to ensuring rational design and safe construction in large deformation tunnels of soft rock. As described in this paper, theoretical analysis, numerical simulation and field monitoring were employed to investigate the surrounding rock stress and displacement state in the Dongsong hydropower station in Sichuan Province, China. The results show that the short-bench construction method can effectively control the deformation of surrounding rock and range of the plastic zone. In order to reserve enough working space, the optimum bench length in the actual construction was 10 to 14 m. The peripheral displacement and plastic radius decreased with the increase of tunnel support strength and the advance of supporting time. The displacement can be effectively controlled by applying the second lining in time at a position about twice the diameter of the hole (16 m) from the working face. A reasonable reserved deformation should be adopted to avoid secondary expanding excavation. The values of different positions in the tunnel laterally and longitudinally may be different, and adjustments are needed according to the actual situation.

Open-access reader

About this research paper

What this paper is about

The problem of large deformation is very prominent in deep-buried tunnel excavation in soft rock, which brings serious potential safety hazards and economic losses to projects. Knowledge of the stress field distribution and deformation law is the key to ensuring rational design and safe construction in large deformation tunnels of soft rock. As described in this paper, theoretical analysis, numerical simulation and field monitoring were employed to investigate the surrounding rock stress and displacement state in the Dongsong hydropower station in Sichuan Province, China. The results show that the short-bench construction method can effectively control the deformation of surrounding rock and range of the plastic zone. In order to reserve enough working space, the optimum bench length in the actual construction was 10 to 14 m. The peripheral displacement and plastic radius decreased with the increase of tunnel support strength and the advance of supporting time. The displacement can be effectively controlled by applying the second lining in time at a position about twice the diameter of the hole (16 m) from the working face. A reasonable reserved deformation should be adopted to avoid secondary expanding excavation. The values of different positions in the tunnel laterally and longitudinally may be different, and adjustments are needed according to the actual situation.

Why it matters

OpenAlex reports 47 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The problem of large deformation is very prominent in deep-buried tunnel excavation in soft rock, which brings serious potential safety hazards and economic losses to projects. Knowledge of the stress field distribution and deformation law is the key to ensuring rational design and safe construction in large deformation tunnels of soft rock. As described in this paper, theoretical analysis, numerical simulation and field monitoring were employed to investigate the surrounding rock stress and displacement state in the Dongsong hydropower station in Sichuan Province, China. The results show that the short-bench construction method can effectively control the deformation of surrounding rock and range of the plastic zone. In order to reserve enough working space, the optimum bench length in the actual construction was 10 to 14 m. The peripheral displacement and plastic radius decreased with the increase of tunnel support strength and the advance of supporting time. The displacement can be effectively controlled by applying the second lining in time at a position about twice the diameter of the hole (16 m) from the working face. A reasonable reserved deformation should be adopted to avoid secondary expanding excavation. The values of different positions in the tunnel laterally and longitudinally may be different, and adjustments are needed according to the actual situation.

Key concepts: Rock mass classification, Geotechnical engineering, Deformation (meteorology), Excavation, Displacement (psychology), Geology, Distribution law, Stress field

Related papers

Back to paper searchBrowse research topicsOriginal source
Stress Field Distribution and Deformation Law of Large Deformation Tunnel Excavation in Soft Rock Mass — Research Paper | ScholarLens