2008•Tunnel ConstructionRequires access

Cost Analysis on Different Excavation Modes of Hard Rock Tunnels

Song Yi

Open publisher page 0 citations

Abstract

At present,most of the mountain-crossing tunnels in China are constructed by manual excavation method,which can not satisfy the requirements of rapid tunnel excavation due to its low mechanization and automatization level.Based on the experience in the construction of a tunnel,the authors introduce the equipment matching for manual excavation and excavation by double drilling jumbos respectively and present the smooth blasting technology.The authors summarize the time required by each excavation step of manual excavation and excavation by double drilling jumbos respectively and estimate the time required by each step of excavation made by single drilling jumbo mode.Therefore,the authors calculate and analyze the cost of different excavation modes.Finally,the authors conclude that lower cost and less time are needed for excavation by drilling jumbos,which is favorable for rapid tunnel driving.

About this research paper

What this paper is about

At present,most of the mountain-crossing tunnels in China are constructed by manual excavation method,which can not satisfy the requirements of rapid tunnel excavation due to its low mechanization and automatization level.Based on the experience in the construction of a tunnel,the authors introduce the equipment matching for manual excavation and excavation by double drilling jumbos respectively and present the smooth blasting technology.The authors summarize the time required by each excavation step of manual excavation and excavation by double drilling jumbos respectively and estimate the time required by each step of excavation made by single drilling jumbo mode.Therefore,the authors calculate and analyze the cost of different excavation modes.Finally,the authors conclude that lower cost and less time are needed for excavation by drilling jumbos,which is favorable for rapid tunnel driving.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

At present,most of the mountain-crossing tunnels in China are constructed by manual excavation method,which can not satisfy the requirements of rapid tunnel excavation due to its low mechanization and automatization level.Based on the experience in the construction of a tunnel,the authors introduce the equipment matching for manual excavation and excavation by double drilling jumbos respectively and present the smooth blasting technology.The authors summarize the time required by each excavation step of manual excavation and excavation by double drilling jumbos respectively and estimate the time required by each step of excavation made by single drilling jumbo mode.Therefore,the authors calculate and analyze the cost of different excavation modes.Finally,the authors conclude that lower cost and less time are needed for excavation by drilling jumbos,which is favorable for rapid tunnel driving.

Key concepts: Excavation, Drilling and blasting, Drilling, Engineering, Rock blasting, Geotechnical engineering, Mining engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Cost Analysis on Different Excavation Modes of Hard Rock Tunnels — Research Paper | ScholarLens